- This session is a general introduction to the Beta function and the determination of the task line.
- The meeting intends to determine the content and main responsibilities of the members in phase II
- Length of meeting: 1 hours 30 minutes (because it is a departure meeting, so say more)
- Meeting place: 7 Apartment 1 Floor reception room
|
Beta phase main Task description |
Tomorrow Mission list |
Liu Hu |
main responsibilities and tasks: 2, Track the progress of each player and adjust the work schedule of the next day dynamically according to the progress of completion 3, Mainly responsible for the composition of each experiment unit test, the back end and the experimental data display related to the JINJIA2 template rendering work data dependency: Liu Hu---> Harrison He, Huang Yumeng (Liu Hu requires JINJA2 data template rendering based on Harrison he data-processing files and formulas written by Huang Yumeng) |
# Learn how to automatically build and attempt to deploy test files on GitHub and automatically test on each push |
Harrison he |
main responsibilities and tasks: 1, responsible for the correctness of data processing and unit testing for each experiment, Ensure that every experimental data processing takes into account a sufficient number of cases 2, Be responsible for the interface convention of the back-end program processing file, communicate with the classmate who writes XML file in front. data dependencies: Harrison He---> Liu Hu (Harrison he to be written according to the interface and name specified in the test file written by Liu Hu and need to pass related tests) |
#129 Compose the experiment interface, which contains the following interface contents:
- experimental data processing function interface
- experiment XML file processing interface
-
|
Huang Yumeng |
main responsibilities and tasks: 1, Be responsible for recording the task completion and difficulties encountered during the meeting. 2, Mainly responsible for each experimental data-independent formula composition section |
#130 Learn the unit tests for Python and write a demo or blog |
ISSN |
main responsibilities and tasks: 1, back-end engineer, mainly responsible for the logical composition of the forum section |
  #131 forgot password and send message |
Lu Yu |
main responsibilities and tasks: 1, front-end engineer, Responsible for the new page drawing and the communication and communication with the backend engineer 2, Responsible for the implementation of the method zone function |
#132 Forum interface prototype design. (a) |
Yan Ting |
Main Responsibilities and tasks: 1, user demand Mining and user feedback collection, after the collection of feedback in issue way posted to GitHub 2, because the front-end workload and back-end workload mismatch, from the front-end to the back-end development, steering back-end processing. |
#133 In order to ensure the correctness of the test, it is necessary to extract the test data from some correct reports. The results of the test report need to be checked manually, and the test data in the report is extracted. |
Daily Data statistics:
  |
views |
Independent visitors |
ip |
New independent visitors |
Number of visits |
2015/12/8 Daily Data |
358 |
64 |
69 |
31 |
110 |
Cumulative data as of 2015/12/8 |
14024 |
2558 |
2138 |
|
|
Cumulative Registered Users |
622
|
stand-up meeting photo record: (photographer: Lu Yu)
Situation Note: Due to this week's design of the key week for the compilation course ... In order to prevent the negative and inefficient mood caused by excessive work and stress, the team has developed a scrum meeting every two days from 2015/12/8~2015/14 day, starting from 2015/12/14 to resume the daily Scrum meeting iteration development, To the end of the iteration date is just 10 times the scrum meeting, please pay attention to the teacher Ta ha.
Today's scrum meeting is not counted in 10 scrum meetings. (Departure meeting)
"Beta phase" departure meeting--0th time scrum meeting!