Sprint Review 1. Review the theme of the organization: "How can we do better in the next sprint?" "Time: 40 minutes." Participants: the entire team. Location: Computer classroom. Clerk: Lu Xiaoying. 2. Review process
- Sprint Summary: Our task is a bit too slow to keep pace with, we need to work overtime at a later stage to ensure that we can keep up.
- Take turns: refer to Figure 1.
- Productivity Analysis: Our actual productivity is lower than our expected production, mainly because of the recent need to prepare multiple large jobs and lack of time for communication.
- Improvement: Strengthen communication at the latter stage, ensure the progress of normal completion.
3. Recalling the Auxiliary
Figure 1
4. Recall that the next sprint will focus on what improvements have been made to optimize the code. Team Contribution points:
Cai Sun: 22
Lu Xiaoying: 19
Lin Yu-yu: 20
Wang Xinming: 21