Soft Test Information System Supervisor: . years 4 Month in Day Work
First, information application system analysis design stage supervision
1 , what are the entry conditions for demand analysis? (remember)
A: The owner of the unit and the contractor signed a construction contract, and the preliminary project development plan to reach agreement, can be counted into the requirements analysis stage.
2 , what is the goal of demand analysis?
A: The objective of the requirements analysis is to describe in depth the functionality and performance of the software, determine the constraints of the software design and interface details of the software with other system elements, and define other effective requirements for the software.
3 , what are the results of the demand analysis phase? (remember)
Answer: 1 ) project Development Plan
2 ) software Requirements Specification
3 ) Software Quality Assurance Program
4 ) software Configuration management plan
5 ) Software (Preliminary) validation test plan
6 ) User 's first draft of manual
4 , what are the entry conditions for the software outline design phase? (Remember, and understand: Add the outline 2 words, the answer is the same)
Answer: 1 Project Development Plan, quality assurance plan, configuration management plan and other supporting plans through review and formal approval;
2 ) software Requirements specification through review;
3 The configuration Management allocation baseline is established with the software Requirement specification as the core.
5 , what are the entry conditions for the detailed design phase of the software?
Answer: 1 ) Software Summary design description through the review;
2 the software outline illustrates that the external interface design has been incorporated into the configuration management controlled library.
6 , description algorithm In addition to the flowchart, there are some other tools, such as which 3 species?
Answer: If PAD graphs, PDL language (pseudo code), HIPO graphs and so on.
7 , what is the outcome of the software design phase? (remember)
Answer: 1 ) Summary design specification;
2 ) database design manual;
3 ) User manual;
4 ) Software Summary Design Manual (Database design section can be a single volume)
5 ) software detailed design instructions;
6 ) software coding specification;
7 ) integration test Plan.
8 , software engineering requirements of software quality assurance as the core, tightly grasp which 8 a major link?
A: Software engineering requirements to software quality assurance as the core, tightly grasp the software production methods, demand analysis, software design, software manufacturing tools, testing, verification and validation, review and management of eight major links
Second, information application system implementation stage supervision
1 , what is the entry condition for the coding phase? (remember)
Answer: 1 Software Detailed design instructions have passed the review
2 Software Detailed design instructions have been entered into the configuration management controlled library
3 all software units that need to be coded have been developed with corresponding module development files.
2 , unit test entry conditions?
Answer: 1 ) Complete all unit encodings
2 ) Software unit error-free by compiling
3 ) Complete static testing such as code review;
4 all software units are included in the Software Development Unit's configuration management controlled library
3 , integration test entry conditions?
Answer: 1 ) The Integrated Software Unit is error-free by compiling
2 ) The Integrated Software Unit is reviewed by code
3 ) The Integrated Software unit tests and meets the test requirements through the unit dynamic
4 ) The Integrated Software Unit has been placed in a software development unit's configuration management controlled library
5 ) software assembly testing and testing tools with integrated test plan requirements
4 , confirm test entry conditions?
Answer: 1 ) software completed the integration test;
2 ) software can be run
3 All software code is under Configuration management control
4 ) already has the software validation test environment stipulated in the contract
5 , System test entry conditions?
Answer: 1 ) Complete and pass the software validation test;
2 ) All software products are under the Configuration management control;
3 ) is already equipped with a software system testing environment.
6 , the focus of the commissioning phase of supervision? (remember)
A: The focus of the commissioning phase of supervision is:
1 assist the owner and the contractor to deal with the problems arising during the system commissioning and record them;
2 for a number of recurring problems, in the manual test to give the necessary attention to the contractor to supervise the necessary solutions;
3 supervise and inspect the training work of the contractor during the trial operation stage. Supervise the training of the contractor during the trial operation.
7 , the focus of technical training supervision? (remember)
Answer: 1 supervise the contractor to develop the training plan according to the contract and the owner's requirements;
2 To Review the operability of the training plan and to define the training target, training materials, training time, training methods and training teachers in the training plan;
3 supervise the implementation of the technical training Plan, assess the training materials and teachers, and inform the owners of the implementation and effectiveness of the training plan.
Supervision of the acceptance stage of information application system
1 , what are the prerequisites for the acceptance of the information application system? (remember)
Answer: 1 ) has passed the computer software to confirm the test review;
2 ) has passed the System test review
3 all kinds of documents stipulated in the contract or contract are complete;
4 ) software products have been placed under configuration management;
5 Other conditions of acceptance stipulated in the contract or the annex to the contract.
2 , what are the steps for acceptance? (remember)
Answer: 1 ) Submit an application for acceptance
2 ) Develop acceptance plans
3 ) Establishment of the Acceptance Committee
4 ) for acceptance testing and configuration audits
5 ) for acceptance review
6 ) Form the acceptance report
7 ) hand over the product.
3 , information application system acceptance can be divided into which 2 a big part? What can the order be divided into?
A: Acceptance can be divided into two large parts: Software configuration audit and acceptance test, the sequence can be divided into: Document audit, source code review, configuration script audit, test program or script audit and executable program test.
4 , what are the main development documents?
A: Main development documents: Requirement Specification, summary design specification, detailed design specification, database design specification, test plan, test Report, Program Maintenance Manual, Programmer development Manual, user manual and project summary report.
5 , what are the main management documents?
A: The main management documents are: Project proposal, quality control plan, configuration management plan, user training Plan, Quality summary report, review report, meeting record and development progress monthly.
6 , what are the prerequisites for acceptance testing? (i.e., what work is generally done before the user acceptance test?) )
Answer: 1 software development has been completed and all of the known software flaws have been addressed.
2 The acceptance test plan has been reviewed and approved and placed under document control.
3 ) The review of the software requirements specification has been completed;
4 ) The review of the summary design and detailed design has been completed;
5 ) code review of all critical modules has been completed;
6 ) Review of Unit, integration, system test plans and reports has been completed;
7 all of the test scripts have been completed and executed at least once and passed the review.
8 Use the Configuration management tool and the code is placed under configuration control.
9 The software problem processing process is ready.
Ten ) has developed, reviewed and approved acceptance test completion standards.
7 , how to deal with the failure of acceptance?
A: The contractor shall revise the relevant questions as soon as possible, re-verify or transfer to the contract dispute processing procedure according to the acceptance evaluation opinion.
8 , what are the supervisory measures for the system handover?
Answer: 1 ) Review the list of project information of the contractor.
2 assist the owner and the contractor to transfer the project information.
3 ) Ensure consistency of software documentation and software.
4 development software To do backup, keep in a safe place, document material archive.
9 , what are the supervision measures of the system guarantee period?
Answer: 1 supervise the contractor to carry out systematic protection according to the stipulations of "contract" and check the implementation of the system guarantee.
2 ) to record the quality issues raised by the project owner.
3 ) urge the contractor to repair and maintain the unit.
4 ) to confirm the contents of the repair by the contractor.
Soft Test Information System Supervisor: April 29, 2016 homework