| Document |
|
Executive person |
|
Details |
|
Feasibility Analysis Report |
|
Product Manager |
|
The implementation of the project is technically, economically and socially feasible, available as a possible implementation of options and the pros and cons of implementing the scheme. |
|
Project Development Plan |
|
Product Manager |
|
The implementation programme develops specific plans, which should include the responsible personnel for each part of the work, the progress of development, the budget for development funds, the hardware and software resources required. |
|
Software Requirement Specification (software specification) |
|
Product Manager |
|
The function, performance, user interface and operating environment of the software developed are described in detail. This document must be detailed, clear, avoid unclear requirements, development costs wasted. I dropped a lot of pits here. |
|
Overview Design Manual |
|
Development staff |
|
The manual is a summary of the actual stage of the work, it should explain the function allocation, module division, the overall structure of the program, input and output and interface design, operation design, data structure design and error processing design, to provide a basis for detailed design. |
|
Detailed design Instructions |
|
Development staff |
|
It focuses on how each module is implemented, including implementation algorithms, logical processes, and so on. |
|
User Operating Manual |
|
Product Manager |
|
This manual provides a detailed description of the software's functionality, performance, and user interface, giving the user a specific understanding of how to use the software, providing the operator with knowledge of the various operating conditions of the software, in particular the specifics of the operating method. |
|
Test Plan |
|
Test QA Staff |
|
In order to do the integration test and acceptance test, we need to develop an implementation plan for how to organize the test. The plan should include the content of the test, progress, conditions, personnel, the selection of test cases, the allowable deviation range of the test results, etc. |
|
Test Analysis Report |
|
Test personnel |
|
After the completion of the test work, the test plan should be submitted a description of the implementation of the test results are analyzed, and put forward the test of the concluding comments. |
|
Development progress Report |
|
Development staff |
|
The monthly report of the software personnel to the management of the project progress report, which should include the progress plan and actual implementation of the comparison, phase results, problems encountered and solutions, and next month's plan. |
|
Project Development Summary Report |
|
Product Manager |
|
After the completion of software project development, should be compared with the project implementation plan, summarize the actual implementation of the situation, such as progress, results, resource utilization, cost and input of manpower, in addition, also need to evaluate the development work, summed up the experience and lessons. |
|
Software Maintenance Manuals |
|
Development staff |
|
Mainly includes software system description, program module description, operating environment, support software Description, maintenance process description, easy to maintain the software. |
|
Software Problem Report |
|
Test personnel |
|
It points out the registration of software problems, such as date, discovery person, status, problem belongs to the module, to provide preparation documents for software modification.
|
|
Software Modification Report |
|
Development staff |
|
After the SOFTWARE PRODUCT is put into operation, it is found that it needs to be amended, changed and so on, the existing problems, modification considerations and the impact of the changes should be described in detail and submitted for approval.
At present, we are through a number of management sites, by testers to send bugs, developers accept the repair. Zen Road |
|
|
|
|
|