Qingrun () 10:20:57
Please speak in the group. It is annoying to enter verification codes for all temporary sessions. I will not accept temporary sessions in the future.
Forgotten dog () 10:21:31
Can a project without a timetable be called ???
Fool @ SZ () 10:21:36

Qingrun () 10:22:22
The project has nothing to do with the schedule.
Projects without a Schedule have no plans and are basically not operational, but they cannot be defined as not projects.
Forgotten dog () 10:22:36
What is the exact definition of the project ???
 
Forgotten dog () 10:22:51
How do I think the time schedule is a specific attribute of the project?
Forgotten dog () 10:23:41
Without it, there is no way to talk about a project. Can it be called a project ???

 
Qingrun () 10:24:00
Haha, it only means that you are still in the written stage. You can say that the schedule or even many things cannot be used as the properties of the project.
A project (my personal definition) is a series of operations that need to be implemented to achieve a certain goal.
Qingrun () 10:24:27
The sequence of these operations can be changed and the time can be adjusted. As long as the operation is performed for this purpose, even if the operation is incorrect, it doesn't matter.
Qingrun () 10:25:28
There may even be a lot of operations that are contrary to the purpose, which does not matter. Haha
Qingrun () 10:25:35
Because people always make mistakes.
Forgotten dog () 10:25:49
When we were young, were we always doing this?
Forgotten dog () 10:32:36
I think there is little difference between projects and projects that do not have a timetable ....
Forgotten dog () 10:32:38
Haha
Qingrun () 10:35:31
Well, as long as it is a purposeful task, it can be called a project.
Forgotten dog () 10:36:27
That's too broad...

Haha, I understand the failed project, or the project...
Qingrun () 10:36:29
The timetable is not the most important.
Therefore, some people think that work is just a play. This kind of talent really comes because of interest, and this kind of talent may do better.
However, such a person needs management, and effective and reasonable management can achieve better results.
Forgotten dog () 10:36:30

Qingrun () 10:36:39
The meaning of a project is huge.
Forgotten dog () 10:42:56
I'm depressed first. I can't figure it out again...
 
Forgotten dog () 10:43:16
How do I think that the schedule should be an important attribute of the project...
Qingrun () 10:44:59
Important attributes are good, but not necessary.
Can you distinguish between necessity and importance?
Qingrun () 10:45:28
There are only two required properties for the project, one for the purpose and the other for the operation.
Qingrun () 10:45:37
With these two, it can be called a project.
Qingrun 10:46:59
However, time, plan, personnel, resources, and so on are only important attributes. With this, the project can be said to be more complete.
One reason that personnel are not necessary is that some projects can be completed without human intervention. It is done by people through machines or a series of machines.
The person who forgot the dog: 10:53:41
OK
Fool @ SZ () 10:53:54
Actually
There is a timetable for doing everything.
Some schedules are relatively loose.
Fool @ SZ () 10:54:10
Some have strict schedules.
Written in the Schedule
Fool @ SZ () 10:54:35
Loose
Time is less urgent
Sometimes I am not aware of the existence of a timetable.
Qingrun () 10:55:48
Well, this is another question about reasonable and unreasonable schedules.
Forgotten dog () 10:56:54
Thank you ..
In my opinion, it is not enough to make the timetable an important attribute.

There are only two required properties for the project, one for the purpose and the other for the operation.

The goal is guaranteed by time, so the timetable should be included in the necessary attributes, not just important.
 
Fool @ SZ 11:00:56
Priorities
Urgent and important
There are urgent and unimportant
There are not urgent and important
There are also non-urgent and unimportant
It is urgent and important to have a strict schedule to control the progress within a controllable range.
For non-urgent and unimportant tasks, strict schedules may not be created, so you can do it slowly. specifying a schedule also requires costs.
Ybb11: 02: 06
I do things, by feeling
Qingrun 11:02:36
By feeling is also a way to do the project, so there is a CMM1-5-level difference.
Fool @ SZ () 11:02:53
For example, every small version of our company has a strict submission time and a strict release time.
 
Fool @ SZ () 11:03:25
Fall in love is what you need to feel

Ybb () 11:05:15
Well, work should be treated in a loving mood

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.