I. Progress (DORMITORY)
We will have to reply tomorrow, but we have not yet run the effect on the target. A little pity, but the small partners also try their best. Anyway, let's reply tomorrow to cheer up. We
Happy cooperation, but do not relax, because there are web design we are also parner.
Second, Sprint Backlog
Not chected out |
|
NOTE |
|
1234 |
1 |
Interface needs to be improved |
|
1234 |
1.2 (30%) |
The algorithm needs to be modified |
|
1234 |
1.2 (50%) |
The algorithm needs to be modified |
|
1234 |
1.2 (70%) |
The algorithm needs to be modified |
|
1234 |
1.2 (70%) |
The algorithm needs to be modified |
|
1234 |
1.2 (85%) |
The algorithm needs to be modified |
|
1234 |
1.2 (87%). 3 (20%). 4 (30%) |
Feature links to be strengthened |
|
1234 |
1.2 (87%). 3 (20%). 4 (30%) |
Feature links to be strengthened |
|
Because the landing interface and the interface can not be connected, so I think today and yesterday completed the same progress.
Three. Burndown Chart
Each group selected a classmate as "UI director", the project user interface, user experience design overall grasp.
See chapter 12th of the Law of construction.
The results of the work should be reflected in the blog.
Sprint 23rd Day