650) this.width=650; "Src=" Https://s5.51cto.com/oss/201711/15/ed4aca6c99960eac581bfbdd03534068.png-wh_500x0-wm_3 -wmp_4-s_2593249228.png "title=" Speed up um. png "alt=" Ed4aca6c99960eac581bfbdd03534068.png-wh_ "/>
Topology diagram as above,
Experiment Objective: 1, realize the interconnection of each different network segment's host
2, dynamic demonstration under the process of hot backup, VLAN1 and VLAN 2 main line is the left host, VLAN3 and VLAN 4 belongs to the backup machine under normal circumstances.
Experimental steps: 1, first establish the vlan1,2,3,4 on the switch, then associate the VLAN with the switch interface, then the port F20,f21 trunk,
VLANs are implemented with interface affinity:
Inter FAS0/1 Entry Interface
Switch Mode acc
SW ACC Vlan1
2, implement create lvlan1,2,3,4 on the left multilayer switch, then Port trunk, then give each VLAN a gateway IP,
Inter VLAN 1
IP Add 192.168.1.1 255.255.255.0
Exit
Trunk:inter the port to FAs 0/20
SW TR Enc Dot
SW MO TR
3, the same operation on the right multilayer switch, only slightly different, when the VLAN set the gateway IP, must be different from the input on the left, as follows
Inter VLAN 1
IP Add 192.168.1.2 255.255.255.0
Exit
4, the switch on the left to implement the operation of the host, the right to implement the operation of the backup machine
Inter VLAN 1
Standby 1 IP 192.168.1.250//Set up virtual gateways
Standby 1 priority 105//increase the default precedence by 5 points, default 100
Standby 1 preempt//enable preemption function
Inter VLAN 2
Same operation
Inter VLAN 3,inter VLAN 4
On the right side of the backup machine operation as follows
Inter VLAN 3
Standby 3 IP 192.168.3.2 255.255.255.0
Standby 3 Priority 105
Standby 3 preempt
Attention:
1, don't forget to turn on the routing feature: IP routing
2, to set the IP gateway of each PC to 250 of the above experiment,
STANDBY Hot backup HSRP Hot Backup routing protocol