The first stage of the sprint is completed in a blink of an eye, before the sprint is postponed for some reason.
The first stage of the overall is to do the function of the operation, but the feeling is just some basic function implementation.
1. In the general arithmetic can see, in our survey of the user needs, distance from the user's requirements or a certain distance, based on the team's time coordination problem, so we will try to arrange the time to catch up with the progress.
2. At this stage, we feel that the main function of the overall operation of the experiment, the layout of the problem and the multi-functional experiment to improve the future.
3. Stage Burndown Chart:
Each player's progress is quite, individual one or two a bit backward, but in summary before also submitted to, achieved the first stage of the requirements.
4. After the students after the trial, give us the feeling is general, there is no prominent point, although this is the first stage, our requirements are small, but compared to other groups of progress a little behind.
5. The first phase of contribution:
Wang Junkai 30
Wang Yihui 25
Rockerger 25
Ma Zhilei 20
Summary of the first spring sprint