The concrete implementation steps of network integrated wiring

Source: Internet
Author: User

    only for integrated wiring project system integration, mainly divides into the design, the construction, the test acceptance 3 main stages, "the plan demonstration" before is the design stage, the middle is the construction stage, "The index test" after is the test acceptance stage. The shadow part of the figure is borne by network integrators and project supervisors, but it is also closely related to network cabling.

1, survey site

The main task is to negotiate with the customer network requirements, on-site survey of buildings, according to the user points of information point of location and quantity requirements, reference to building plans, decoration plans and other information, combined with network design scheme for wiring construction site reconnaissance, The number and location of the initial reservation information, and the initial location of trunk road and Cabinet. Survey objects include: building structure, room (equipment) and wiring management between the location, the route from the electromagnetic environment, wiring facilities, appearance and damage to the building (such as hit the Wall eyes, etc.). Also consider the use of existing space at the same time to avoid strong electricity and other lines, to make comprehensive wiring research report.

2, planning design

The design of the project will have a decisive impact on the whole wiring process, therefore, according to the investigation results of the cost budget, application requirements, construction progress and other aspects of comprehensive consideration, and set out to make detailed design plan. Under the guidance of the Professional standards and regulations of the cabling system, the paper fully considers the requirements of the network design scheme to the wiring system, analyzes the feasibility of the cabling system, such as the spatial distance, the bandwidth and the density of the information points, and designs the subsystems in detail. If the building is under construction, should be timely put forward a comprehensive wiring scheme, according to the overall layout, the road from the situation to the design of the specific requirements, such as floor and floor between the main channel connection, the floor between the lines of the line specifications, pipelines, such as pipeline, in order to successfully carry out the If there is a major flaw in the wiring system design, once the construction is completed, it will cause irreparable loss. Therefore, the user, network design personnel, wiring engineering staff to participate in the evaluation of the program. If you find a problem that may exist, you must review it after the scenario has been modified until the final scenario is formed.

3, construction scheme

According to the wiring system design plan to determine detailed construction details (such as the distribution line by, hit the wall and so on, comprehensive consideration of the design and implementation of the management and operation, the designated project leader and engineering supervision personnel, planning the materials, work and internal and external coordination of construction and management, and other content. The construction plan needs to consider the user side's coordination degree, the wiring plan to the road and the building may cause the damage degree best lets the user know and obtains the opposite party management approval. The construction plan needs to consult with the user, and obtain the approval signature of the user, and appoint the coordination person to cooperate. The proposed budget for

4, budget estimates

is mainly based on information such as building plansSettle the amount of wire, calculate wiring material cost, wiring tool cost, labor cost and duration, etc.

5, on-site construction

Integrated Cabling System implementation phase, mainly including civil Construction: coordinate construction team and owners to carry out the responsibilities of the negotiations, and put forward wiring licensing, mainly drilling, alignment, information socket positioning, cabinet positioning, production wiring marking system and so on. Technical installation: The main cabinet is the internal installation, playing information module, playing a wiring rack. The interior of the cabinet should be arranged neatly and reasonably, the block is distinct, the mark is clear, it is easy to maintain in the future. Different brands of products may have different line-playing special equipment.

The construction site command personnel to have a high quality, should fully understand the wiring design plan, and master the corresponding technical specifications, if necessary, to make the right on-the-spot judgment. When decorating and wiring is carried out at the same time, wiring should strive for initiative, early entry into the investigation, can do in advance, such as digging ditch, drilling, laying pipelines, etc., there are planned construction. The problem that cannot be solved temporarily, the designer must revise the design plan as soon as possible, come up with the solution at an early date.

6, test acceptance

according to the corresponding wiring system standard specifications of the wiring system for the field certification of technical indicators test. Information point test: Generally used 12 point tester, single can carry out, high efficiency, the main test break, deep testing can usually be used flukedsp-called 00O or DTX cable tester, according to the TSB 167 standard, Wiring diagram (WIREM), Length (len), attenuation ( Amenu on), near-end Crosstalk (NEXT), propagation delay (propagationdelay) and other data for testing, and online printing test reports.

Load test: A partial network connectivity performance sampling after a network device is loaded. The

is finally the completion acceptance review and the transfer of technical documentation.

7, document management

After the project acceptance, must provide to the customer Acceptance report form, the content including material actual dosage table, the test report book, the cabinet wiring diagram, the floor wiring diagram, the information point distribution chart as well as the optical fiber, the voice and the video trunk road by the graph and so on, provides the data basis for the future maintenance.

8, cabling maintenance

When the integrated wiring system communication lines and connectivity hardware failure, should respond quickly, provide on-site maintenance, troubleshooting points, and according to customer needs for the existing wiring system expansion and modification.
 

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.