Select a standard information path
According to the investigation by authoritative organizations, 73% ~ 80% concentrated on the physical link layer. Therefore, the Integrated Wiring manufacturer should not only have a complete Integrated Wiring product line, but also consider what kind of information path the user needs. They need a complete and standard-compliant information path, an easy-to-manage network resource, and a long-term healthy network. Therefore, users need some testing instruments and services to facilitate the smooth implementation and application of cabling projects. To this end, as a comprehensive cabling manufacturer, dingzhi is carrying out a complete cabling testing system and services. They believe that the vendor should provide the following services to ensure the early construction of the network, build a long-term healthy network for users to minimize network operation costs.
Device tests before lab entry. For products from the production line, due to material and process reasons, it cannot be ensured that all products have unified physical parameters and performance indicators, and a few or even less than the standard requirements. In this case, the offline product may cause 3 ~ lines per box for users ~ The five channels are unqualified. Therefore, the manufacturer must extract cables from the production line in proportion to detect the cables in the DCM, and issue a test report, which is attached to these products for your reference. The DCM system is a widely used medium-sized cable tester with high sampling rate and precision. The test results can reflect the performance of the tested cable.
Test the link and channel. Cables of different manufacturers have their own indicators. For example, in different temperature environments, their electrical properties may change, and the tension of various cables may vary. Before formal construction, several lines should be tested for links and channels in the actual engineering environment to determine whether the cabling products have excellent performance in this environment. Because in the field test, you can choose a professional Cable Testing Instrument, such as fluke dsp series Integrated Wiring cable tester.
Supervision Test during construction. During the implementation of the project, nonstandard operations are often the key factors affecting the quality of the project. This requires the supervision engineer to perform the test, or assign a small Testing Instrument to the construction personnel for self-testing, to prevent engineering delays due to the expansion of some common faults. DINTEK twin tester can be used in this step.
Pumping Test before acceptance. Before the test and acceptance of all the projects of the owner, the construction party shall organize comprehensive tests and carry out internal acceptance to increase the one-time probability of project acceptance. If the previous work is done in place, you can use a small wire tester to test the wiring sequence and disconnection of the line.
The cabling topology can reflect the cabling position of a cabling project, provide reference and cooperation for the cabling of other systems, and is also an important document for maintaining the network line. In the design process of the wiring diagram, the VISIO software can be used to create an image interface and a topology in the future.
The Distribution Frame includes two types: voice network and data network. Wiring on the voice network distribution frame is intensive, and the data network uses the RJ45 port distribution frame. The distribution frame is an important cabling device connecting users and network devices. Its wiring port number is a valid document for network personnel for line troubleshooting. We recommend that you use NETVIZ for the design of the distribution frame wiring diagram, which can be well linked to show the information of the connected devices and users under each wiring port.
Cable ID
Cables and optical cables are the main media of information transmission, especially in the backbone network. In a network with a large amount of information, cables are clearly identified to facilitate network management and future resizing.
Information port ID
The information port ID should allow users to obtain as much information as possible, such as data port, voice port, line, and destination. In a large project, it is best to have a Unified Numbering standard.
In addition to the testing of these integrated wiring systems, other tests are necessary to ensure the good performance of the supporting systems: equipment load testing, electromagnetic environment testing, grounding testing, network throughput and load testing, network traffic analysis, and so on.