Use software engineering theory to answer the following questions
--Read project-based software engineering_Object-oriented Research Methods
2007-7-2
1. Think about establishing a tool room with four friends. What happens if you simply ask your friends to pick up tools and wood, start sawing, and hammer until a tool room appears? How do you proceed to ensure a reliable, well-structured, and sturdy hut is complete?
2007-7-2
Answer:If you do not plan to start the project blindly at the beginning, the consequences will certainly be very bad. Because the idea is still in the divergence process without centralized management, the performance process will cause delays in the construction period or failure of the results. If it is me, I will first draw a blueprint, and then plan and design. Reasonable personnel arrangement is a key point for the project to be conducted on time. In this way, the risk can be avoided and completed smoothly during the project construction process.
2007-7-2
2. How will you use object-oriented methods and process-oriented methods to conceptual the construction process of a tool room? Are there any differences between the two? Why? What are the differences between the software systems used for management tool building? Why?