What is APS advanced scheduler (Advanced scheduler Scheduler) I

Source: Internet
Author: User

What is an advanced Plan schedule )?

Some are called advanced planning systems, while others are called advanced planning and scheduling ). Definition is not the most important. The most important thing is that all resources are synchronized, real-time, constrained, and simulated, regardless of material, machine equipment, personnel, supply, and customer needs, transport and other influencing planning factors. Long-term or short-term plans are optimized, compared, and executable. It will adopt a memory-based computing structure ,. This kind of computing processing can be performed continuously. This completely changed the batch processing computing mode. All supply chain constraints can be considered concurrently. When each change occurs, APS checks capacity constraints, raw material constraints, demand constraints, transport constraints, and capital constraints at the same time, which ensures that the supply chain plan is effective at any time. Genetics will also be usedAlgorithmTechnology. It is a search technology and its goal is to find the best solution. This search technology is an Optimized Combination Based on imitating the biological evolution process. The basic idea of genetic algorithms is that evolution is to select the optimal type. Genetic algorithms will be applied to APs to obtain "Optimal" solutions. Currently, the APS system combines the multi-layer proxy technology and the intra-manufacturing APS Based on simulation to solve the synchronization problem of the network-oriented structure, simulate the APS optimization sequencer to solve the order conflict problem in the factory. In this way, the preparation and sequence of APS plans can be provided to manufacturers to address global priority and local optimization order of the factory, to meet the growing demand of the manufacturing industry for customers.

APSWhich of the following content should be included?

1.Job-based order priority plan
2. Event-based resource utilization maximization plan
3. Resource-based (TOC)-based bottleneck constraint plan
4. feasible plan based on material constraints
5. Future demand plans based on history
6. Distribution configuration plan based on supply Resource Optimization
7. Optimizing the transportation plan based on transportation resources

APSProvides Solutions for four types of manufacturing models in the manufacturing industry (refer to the xplanner advanced planning scheduling system ):

1 The stream program model and APs are mainly about sequential optimization. 2 , Discrete model, APS mainly solves the problem of multi-process and multi-resource optimization and scheduling. 3 , Mixed process and discrete model. APS simultaneously solves the problem of order and scheduling optimization. 4 The project management model and APS mainly solve the problem of minimizing the Key Path and cost time.

APS Consider solutions for different industries. The main focus of APS is the process logic constraints and resource capability constraints, and the materials and process processes are closely linked. various optimization rules. calculate between the earliest possible start time and the latest possible start time. materials can be re-allocated and replaced, resources can be re-allocated and can be replaced. plan schedules consider flexibility (buffering), cost constraints, non-deterministic processes, and statistical probability theory. compare and analyze multiple optimization solutions.

APS Software generally consists of five main modules:Demand Planning, production planning and sorting, distribution planning, transportation planning, and enterprise or supply chain analysis.

 

For more information about the scheduler scheduling function module, see the next article.

 

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.