Basic application of Hyper-V



Experimental topologies such as

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M01/4B/76/wKiom1QtYOGzmGP8AAFs-OKwtOU659.jpg "title=" 36020141002194731102.jpg "width=" 730 "height=" border= "0" hspace= "0" vspace= "0" style= "width:730px;height:360px;" alt= "Wkiom1qtyogzmgp8aafs-okwtou659.jpg"/>

1) 12server5:hyper-v host, installed the Windows Server Datacenter system, in the system

The Hyper-V role is installed on the


2) 12server6:hyper-v host, installed the Windows Server Datacenter system, in the system

The Hyper-V role is installed on the


3) win7-1 computer: The Windows 7 system is installed.


Experimental requirements

1) Deploy the experimental environment as above topology, and install on 12SERVER5 and 12SERVER6

Hyper-V role.

2) Create three types of NICs on 12server5 and 12server6, with the names: Extranet,internal and private, respectively, for external, internal, and private networks

3) Install a Windows XP virtual machine on 12SERVER5 to ensure that Windows XP has access to the 12SERVER6

4) Install a Windows Server Datacenter virtual machine on 12SERVER6 and configure it as a parent disk.

Then use the differencing disk to create 2 Windows Server Datacenter virtual machines, with the names respectively

Server1 and Server2. Then use the snapshot to save the current state for both virtual machines.

5) Migrate the Windows XP virtual machine in 12server5 to the 12SERVER6 host.

6) Ensure that Windows 7 remotely manages both 12SERVER5 and 12SERVER6 through the Hyper-V management tool.



Note: 1. The live migration of hyper-V requires an ad environment, now creates a contoso.com and joins the two host domains

2. Experimental environment with VMware Workstation installation of three hosts, based on two installed Hyper-V role, need to change two parameters, if you do not change the virtual machine when adding a role, "Unable to install Hyper-V virtual machine program is in progress" error

i) in the virtual machine settings, the CPU option is checked "virtualize Intel vt-x/ept or Amd-v/rvi"

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M02/4B/78/wKioL1QtYTmyk2h7AAGCuLSDCT8251.jpg "title=" 36020141002193711508.jpg "alt=" Wkiol1qtytmyk2h7aagculsdct8251.jpg "/>

II) Locate a file in the "VMX" format of the virtual machine directory and right-click to open it in Notepad

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M01/4B/78/wKioL1QtYUqAAeFNAAQ9x3vOnHA102.jpg "title=" 36020141002193828825.jpg "width=" 860 "height=" 494 "border=" 0 "hspace=" 0 "vspace=" 0 "style=" WIDTH:860PX;HEIGHT:494PX; " alt= "Wkiol1qtyuqaaefnaaq9x3vonha102.jpg"/>

III) Add at the end of the text


Hypervisor.cpuid.v0 = "FALSE"
mce.enable = "TRUE"


650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M01/4B/76/wKiom1QtYT6DIZmGAALwYDCTCTA542.jpg "title=" 36020141002193903984.jpg "width=" 860 "height=" 410 "border=" 0 "hspace=" 0 "vspace=" 0 "style=" width:860px;height:410px; " alt= "Wkiom1qtyt6dizmgaalwydctcta542.jpg"/>

Well, start now.


(i) 12SERVER5 add Hyper-V role

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M02/4B/76/wKiom1QtYVvy6IUsAAKGuCQE0dU621.jpg "title=" 36020141002195922898.jpg "alt=" Wkiom1qtyvvy6iusaakgucqe0du621.jpg "/>

Wait to add three Nic, Skip here, next

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M02/4B/78/wKioL1QtYZzhEhP_AAJnfuxYDFg405.jpg "title=" 36020141002200105839.jpg "alt=" Wkiol1qtyzzhehp_aajnfuxydfg405.jpg "/>

Because you want to migrate the virtual machine to 12SERVER6, tick "Allow this server and accept live migration of virtual machines" using the Kerberos protocol

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M02/4B/76/wKiom1QtYYXBvfyPAALNq-f0W-g144.jpg "title=" 36020141002200516927.jpg "alt=" Wkiom1qtyyxbvfypaalnq-f0w-g144.jpg "/>

Automatically restart your computer after installation

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M00/4B/79/wKioL1QtYdWjBHPFAAIXkCrFvPs031.jpg "title=" 36020141002200629397.jpg "alt=" Wkiol1qtydwjbhpfaaixkcrfvps031.jpg "/>

Reboot into Metro interface, click Hyper-V Manager, select Virtual Switch Manager

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M00/4B/76/wKiom1QtYbqDyi_QAAH_lHrhH88506.jpg "title=" 36020141002213350305.jpg "alt=" Wkiom1qtybqdyi_qaah_lhrhh88506.jpg "/>

(ii) Creation of three network cards

Add external network card prompt 650) this.width=650; "Src=" http://s3.51cto.com/wyfs02/M00/4B/79/wKioL1QtYfnTKj1aAAC7hz-mPHE234.jpg " Title= "36020141002220215957.jpg" alt= "wkiol1qtyfntkj1aaac7hz-mphe234.jpg"/> Here Check the Microsoft Network adapter multicast protocol at local connection properties , remove the IPV4,

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M01/4B/79/wKioL1QtYjKT9rVlAAHTCVcy4hA144.jpg "title=" 36020141002221533718.jpg "alt=" Wkiol1qtyjkt9rvlaahtcvcy4ha144.jpg "/>

The next three types of network cards are created

650) this.width=650; "src=" Http://s3.51cto.com/wyfs02/M01/4B/79/wKioL1QtYiCwxO9jAAGs35ckP9Y592.jpg "title=" 36020141002221039632.jpg "alt=" Wkiol1qtyicwxo9jaags35ckp9y592.jpg "/>





Windows Server Learning Notes (Lab) basic apps for Hyper-V

Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.