What are the details of the decoration offer? Believe that many consumers are more concerned about it, according to the use of materials and decoration methods, the price is not the same, today we are with Yunme (www.iyunmaizs.com) to understand the basic situation it.
A. Living room
1, the top surface emulsion paint 28.80m227.00777.60 Original Wall Brush interface agent, full scraping putty two times, any coins once polished, brush China resources latex paint. (with shovel peeling)
2, wall paint 50.00m226.001300.00 original Wall Brush interface agent, full scraping putty two times, any coins once polished, brush China resources latex paint. (with shovel peeling)
3, TV wall 10.00m2260.002600.00 Wood keel base plaster board lining tea mirror flower patch Wallpaper
4, the cloakroom 2.43m2520.001263.60 cabinet body high-quality machine block Big core board, back lined with nine multilayer board, inside Boeing film. Flat door. (CleanOil process)
5. Wardrobe Door 2.43m2320.00777.60 solid wood strip Venetian shape gate
6, living room corridor ceiling 16.50m2135.002227.50 light steel keel, 9mm thick gypsum board.
7, Bar counter 1.00 items 1300.001300.00 Large-core plate-base-layer patch panel color treatment
8, Wu Mouth set 8.65m105.00908.25 large-core board base-level decoration panel color processing width 710mm
9, Door 1.00 dooréì 1280.001280.00 finished wood composite Door
Subtotal: 12434.55
Second, master bedroom
1, the top surface emulsion paint 12.50m227.00337.50 Original Wall Brush interface agent, full scraping putty two times, any coins once polished, brush China resources latex paint. (with shovel peeling)
2, wall paint 27.00m226.00702.00 original Wall Brush interface agent, full scraping putty two times, any coins once polished, brush China resources latex paint. (with shovel peeling)
3, no door large wardrobe 5.88m2520.003057.60 Cabinet first-class high-quality machine block, back lined with nine multilayer board, solid wood line, cabinet body has a base plate, bulkhead one to two layers of large core board, outside the Boeing film. (CleanOil process)
4, Large wardrobe door 1.26m2200.00252.00 large-core board base plate rubbing processing
5, Gypsum line 14.00m13.00182.00 Gypsum line
6, Wu Mouth set 6.25m135.00843.75 large-core board base-level decoration panel color processing width 710mm
7, Door 1.00 dooréì 1280.001280.00 finished wood composite Door
Subtotal: 6654.85
Three, bedroom
1, the top surface emulsion paint 8.38m227.00226.26 Original Wall Brush interface agent, full scraping putty two times, any coins once polished, brush China resources latex paint. (with shovel peeling)
2, wall paint 31.00m226.00806.00 original Wall Brush interface agent, full scraping putty two times, any coins once polished, brush China resources latex paint. (with shovel peeling)
3, Window set 3.74m85.00317.90 Large-core board base plate rubbing processing
4, Gypsum line 13.70m13.00178.10 Gypsum line
5, Door 1.00 dooréì 1280.001280.00 finished wood composite Door
Subtotal: 2808.26
Four, toilet
1, aluminum buckle plate ceiling 3.80m2135.00513.00 aluminum buckle plate Ceiling
2, Package pipeline 1.00 Items 200.00200.00 Wood keel base sticking damp-proof plate buckle aluminum Buckle Board
3, Door 1.00 dooréì 1280.001280.00 finished wood composite Door
Subtotal: 1993.00
Five, the kitchen
1, aluminum buckle plate ceiling 5.00m2135.00675.00 aluminum buckle plate Ceiling
2, Package pipeline 1.00 Items 200.00200.00 Wood keel base sticking damp-proof plate buckle aluminum Buckle Board
3, Door 1.00 dooréì 1280.001280.00 finished wood composite Door
Subtotal: 2155.00
Total project cost: 26045.66
Vi. Other projects
1, Pipe wiring 1.00 items 500.00500.00 (brick wall slotted 25 yuan/m. Concrete slotted 30 yuan/m. Wire 20 Yuan/m. Wire Box 10 yuan/each. In the medium-term according to the actual work amount settlement, more return less supplement.
2, waterway renovation 1.00 500.00500.00 Mid-term acceptance, according to the actual project volume settlement.
3, Lamp lock installation 1.00 items 300.00300.00 Lighting installation, labor costs. Bath PA 50 Yuan/lamp, downlight and spotlights 10 yuan/lamp, ordinary ceiling lamp 30 yuan/lamp, lamp with 2 yuan/meter, switch socket 2 yuan/each, row fan 20 yuan/each. Complete set of installation 200 yuan/one bedroom, 280 yuan/Two bedroom 350 yuan/three-bedroom.
4, Garbage removal 1.00 Items 350.00350.00 transported to the designated point in the community, not including Sinotrans. One bedroom 200 yuan, two bedroom 260 yuan, three-bedroom 350 yuan
Total: 1650.00
VII. Management fee
1, integrated management fee 27695.7 items 12.00323.48 Total cost of 12%
Subtotal: 3323.48
Total project cost: 31019.14
Note: 1, for any reason, the property deposit and management fees are borne by party A, such as the party B construction personnel violated the property requirements caused by party B Bear.
2, party A carefully review the full set of budget, to prevent party B inadvertently missed items or measurement error to bring unnecessary trouble to party a.
3. All projects in this budget shall be based on the actual amount of the project, such as the amount of the works not reflected in the present quotation, according to the additional items calculated and filled in the "Engineering Change Order", to pay the increase, otherwise deemed to abandon the project.
4, because of the price and quality differences, the above budget does not include hardware (except special labels), lamps, slides, tiles, sockets, switches, junction boxes, bathroom supplies, the whole kitchen, wood flooring and so on.
5, latex paint color (including white) contains two colors, each additional one plus 150 yuan color matching fee.
6, 2.5 square lines of concrete slotted 30 yuan per metre, brick walls of 25 yuan per meter, open wire per meter 20 yuan, 4 square lines per extension of 4 yuan. The original line pipe threading 10 yuan/meter, dark junction box concrete wall 10 yuan/each, brick wall 8 yuan/each, hanging box 5 yuan/each.
7, because of solid wood lines of wood for pure natural materials, so the existence of color differences in wood lines, scar knots, uneven texture size is not a quality problem.
8, the construction process of the original construction projects, such as the change of party A, to pay basic materials and labor costs.
9, party B has the obligation to accompany the purchase of main materials, furniture, lamps, accessories and so on.
10, the budget does not include the budget does not mark the project, such as the project has increased or decreased, fill in the "Project Change Order", the settlement of increase or decrease in the rear can enter the construction phase.
11, if need to Chaigai wall, build a house, change the heating, or carry out a more substantial original structure transformation, need to be from party A to the property company to handle the relevant formalities.
12, the present price list is valid for one months, after signing the contract for a valid quotation.
13, the special order category must sign an order agreement, the payment will not be refunded.
14, the finished product door in the middle section after the installation, this money is not refunded.
15. This offer does not include tax.
The above is the details of Xi ' an decoration offer, I hope we have some help.