Case study on dynamic monitoring and early warning information system of national major construction projects [4]

Source: Internet
Author: User
Keywords Investment information systems operations project management

National major construction project dynamic monitoring and early warning http://www.aliyun.com/zixun/aggregation/32730.html "> Information system case [4]

http://www.csai.cn Author: unknown Source: E-Government Engineering service Network January 2, 2008 comment into the community

System Design Idea

1. To strengthen and improve the statistical work of investment information in the July 2004 State Council decision on investment reform. Strengthen investment statistics, reform and improve the investment statistics system, further timely, accurate and comprehensive reflection of the whole society's fixed assets and investment operation situation, and set up various information sharing mechanism, to provide scientific basis for investment macro-control. Set up investment risk warning and precaution system, strengthen the monitoring and analysis of macro-economic and investment operation "the specific requirements for the system overall design idea."

2, take the Modern project management theory as the guiding ideology.

3, the whole project life cycle of information monitoring and integration processing, thus forming from the project concept stage to the design, implementation phase until the launch operation and evaluation of the whole project life cycle monitoring and decision support.

4, the project approval process and the government affairs Office process unifies.

5, the Central Terminal system, the area end system, the project end system three layer application, the function is mutually unified separately.

6, in the technical route, the use of International Project information portal PIP Technology, is committed to building in line with China's investment and financing system and project management model PIP technology System.

System target
1, the national investment in major construction projects throughout the process, a full range of management. The whole process refers to, from the decision, project, approval to the construction process, completion and acceptance of the whole project cycle management; All-round refers to the function management from the basic information of the project, the organization to the project bidding, the contract, the project investment, the finance, the progress of the project construction process, the quality and safety of the project.

2, the construction of structured, digitized, flow of national major investment project monitoring index System.

System Architecture and Application Mode
System Technology Framework

Within the infrastructure platform, the technical architecture is divided into 6 levels, as shown in Figure one:

  

Figure I: P9PIP technical framework of gold investment project

Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.