Eight Chinese and foreign manufacturers compete for TD network

Source: Internet
Author: User
Keywords TD Chinese and foreign
Shenzhen Special Zone News (reporter Wu) TD Four tender scale is the first three period of the sum, completed after the domestic market pattern will be basically determined.  The industry's three electricity advisory issued a report yesterday that the four-phase network, TD will cover all the country's cities. TD Four bidding by the industry known as TD last piece of "cake", is the largest domestic 3G bidding, but also China's TD network last large-scale bidding. Thereafter, the domestic TD market share will be basically established, the manufacturers from the subsequent replacement equipment to obtain the future profit space will be clearly visible. The report revealed that the TD four-stage tender scale unprecedented, mobile will purchase about 98,000 base stations, TD Three is 2.5 times times the network.  Tenders are expected to be issued this week. Mobile first three TD network has covered 238 cities, base station total of more than 100,000. This will be the coverage of the city to optimize the network, and in 101 prefecture-level cities to create a new TD network.  Reporter learned from the relevant manufacturers, Shenzhen TD Network has covered the SAR and the region outside the densely populated areas, the total number of base stations, more than 2,500, is expected to focus on improving the city and remote areas outside the region coverage.  Mobile recently revealed that unlike the first three-stage network, the four-phase construction of the network tender for the first time to enhance user awareness as the focus, which introduced a number of innovative technology, technical requirements are the most, the expected completion of the network will effectively improve the 2G and 3G signal smooth switching, the main business experience and other key content. It is reported that TD industry chain 8 major manufacturers will still participate in the bidding, and the faction of the manufacturers have also changed. Datang Mobile last month reached a strategic partnership with Ericsson, the world's largest telecoms equipment maker, through Datang Telecom, the same controlling shareholder.  Three electricity advisory report disclosed that TD four period tender, Ericsson will give up independent research and development equipment, directly using Datang mobile TD equipment bidding. ZTE recently signed a comprehensive cooperation agreement with China Putian joint venture, TD and LTE become the focus of cooperation, the industry generally expects the two sides will join hands in bidding.  In addition, the new post three TD construction network in the public bidding of the Datang Mobile Equipment, the new mail will be used Huawei TD equipment, equivalent to join hands with Huawei.  Industry analysis, the tender is actually three factions of the competition, respectively, ZTE-Putian (ZTE and Putian), Datang (Datang Mobile, Ericsson, Beacon Communications), Huawei-NSN department (including Huawei, Nokia Siemens, New Mail). CICC's latest report pointed out that the TD four construction network bidding will still be a price war, Datang and Ericsson will bring huge impact on the alliance, ZTE, Huawei, two companies are expected to ensure that the previous share of a certain difficulty. Previous statistics show that the first three TD construction network bidding, ZTE accounted for the largest market share of 34.2%, Huawei and Datang Mobile respectively, 31% and 13.5% of the share of the second to third place.
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.