The National Electricity Regulatory Commission recently issued "about 2010 years and" Eleven-Five "power enterprise supervision and emission Reduction Notice" (hereinafter referred to as "notice"), decided to the State Grid company, Southern power grid company owned part of the power supply enterprises and 9 central power generation Group, Some coal-fired power enterprises of 9 local power group companies continue to conduct on-site supervision on energy saving and emission reduction. The "notice" clarified the contents of the supervision: for the power grid enterprises, will check the power grid enterprise line loss changes, power grid energy-saving technology reform, the full acquisition of renewable energy power generation network electricity situation, differential electricity prices, such as the implementation of electricity prices, 330,000 volts above the line, 220,000 volts above the operating efficiency of the main transformer, generation rights trading, Energy-saving power generation dispatching economic compensation and information disclosure, demand side management (energy efficiency management, contract energy management, etc.), energy saving and emission reduction funds, the "Eleven-Five" period before four years of energy-saving emission reduction, focus on verifying line loss changes. For power generation Enterprises, will be the supervision of coal consumption and changes in power supply, plant power consumption and changes, unit operating efficiency, sulfur dioxide emissions and emission reduction, flue gas emissions and treatment, comprehensive water consumption and waste water treatment, comprehensive utilization, fly ash, gypsum treatment and comprehensive utilization, energy saving and reduction of capital investment situation, the "Eleven-Five" During the first four years of energy saving and emission reduction, the main verification of coal consumption, plant power consumption, sulfur dioxide emissions and desulfurization unit operating rate of four indicators. According to the working arrangements, the IPCC will comprise nine inspection teams, which are expected to complete the first half. The IPCC requires the inspection teams to further unity, raise awareness, strengthen the leadership of supervision, implement responsibilities and formulate specific supervision work plans. The power enterprises are required to cooperate actively, to prepare relevant materials objectively and truthfully, and to cooperate to do the work of on-site verification. "Source" Office of the Electronic Regulatory Commission
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.