A 10-year negotiations finally ended, Disney settled in Shanghai Pudong dust settles. Xinhua Beijing, November 6, according to Hong Kong, "Wen Wei Po" reported that Shanghai Disneyland demolition within the scope of the Huangzhao road, all kinds of factories in the new plant everywhere. But as early as 2 months ago, the land has been declared requisitioned, the next spring and summer will be formally demolished. "They do not start, is made to make the dough," the local farmers bare of the mystery. A Zhao Xing village, the old man introduced many of the local factories are this year even recently driven to build, for the DI project in the process of expropriation to obtain higher compensation. According to his advice, the reporter found that many of the plant on the road are sparsely populated, the plant is also empty, not only did not start to sign, even the basic facilities such as electric lights are difficult to find traces. From the color of the wall paint and the cleanliness of the movable house, these plants are very new. In one of the old factory buildings, a worker is installing a staircase for the newly built metal factory. Ironically, everyone in the area knows that demolition is imminent, and can even tell the time of demolition and the possible compensation scheme. In the local home, the reporter also accidentally found a "garden", inside the rockery, pavilion, flower racks and other readily available. Whether it is the ground cement, wood racks, pavilions, colors are very new, the seedlings are mostly thin, the top of the pavilion with red paint "x zhai" words is bright and clean dazzling. In the face of the reporter "Why there is a garden," the Marvel, the owners are reluctant to respond. But when the reporter mentions "your house is so big, will certainly lose a lot of money", although he kept denying, but also can't help grinning. There have been rumors that there had been a fraud on the mountain has been a high compensation, attracted tenants to follow, and even the demolition of the area of the "horticulture industry." However, it is understood that as early as the end of September this year, the government departments have been in the garden of the building photographic leave, now also want to cover the building "demolition rich" fear difficult to do.
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.