Guangzhou electric power within one months of three broken record first Super Chivan Chiva

Source: Internet
Author: User
Keywords Mark the same period
Tags agency broken continued high power grid load power supply
China News Agency, Guangzhou, July 14 (Wang Hua 覃羡) this morning, Guangzhou power grid to break through the peak load Chivan Chiva.  This is one months in Guangzhou electric load three times refresh record.  14th 11:16 A.M., Guangzhou electric load reached 10.05 Million-kilowatt, Guangzhou became the first national power grid load more than Chivan Chiva capital city, but also in Beijing, Shanghai, Suzhou, Shenzhen, after the fifth Chivan Chiva mark of the regional grid. Since late June, Guangzhou continued to high temperatures, the highest electricity load in one months three times to refresh history: June 22, the highest load of the first breakthrough last year record, July 10 two broken record, up to 9.93 Million-kilowatt, compared with the same period last year, increased by nearly 10%, July 14 breakthrough Chivan Chiva, compared to the same period last year, , and also exceeded last year's maximum load of 3.3%.  The maximum load of three-degree refresh, the side reflects the economic situation in Guangzhou to the good, electricity demand is exuberant. The reporter learned from the power supply department, the Guangzhou City Construction Committee, Planning Bureau and other departments of the strong coordination, the focus of the summer project has been put into production, Guangzhou area power grid structure to improve the power supply capacity significantly improved.  At today's peak load generation time, the Guangzhou power grid has not occurred equipment tripping and peak blackouts, the important monitoring section did not appear ultra extreme operation. Guangzhou power Supply Bureau related officials said that although the Guangzhou grid today smoothly through the Chivan Chiva mark, but the load peak time, local power grid equipment overload situation still exists. With the development of economy, the maximum load of Guangzhou power grid will continue to be high in the next few years, which predicts that the total electricity load will reach 16.58 Million-kilowatt in Guangzhou area in 2013. Finish)
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.