Guangzhou holding "Big pressure small" project starts construction
Source: Internet
Author: User
KeywordsLarge capacity supercritical coal-fired generating set Guangzhou Holding Heng Yick small thermal power unit
June 8, Guangzhou Holding (600098) and Foshan Public Utility Holding Co., Ltd. jointly invested the construction of Sanshui Heng Yi Power Plant "on large pressure small" 2x600mw supercritical coal-fired power generation units in Foshan Sanshui District held a solemn foundation ceremony. The project estimated total investment of 5.482 billion yuan, 2011 all put into production, the estimated annual output of 6 billion degrees. Guangzhou Holding and Foshan public control companies hold Sanshui Heng Yi Company 50% Equity. Heng Yick Power Plant project to "big pressure small" way to build two 600MW supercritical coal-fired power generation units, the replacement of small generator set capacity of about 840MW, the total investment of 5.482 billion yuan. The first unit is scheduled to be put into operation in June 2011, and the second unit in October 2011. After production, the annual output is expected to be 6 billion degrees, annual income of 2.235 billion yuan. The project is Guangdong province "Eleven-Five" period of key energy construction projects, has been approved by the National Development and Reform Commission review. The company responsible for the introduction, Guangzhou holding position in the construction of the Pearl River Delta for large-scale integrated energy suppliers, is committed to providing a safe and reliable energy supply to the community. The company in the Pearl River Delta Load Center, Foshan investment construction of large capacity, high parameters of the constant benefit power plant project, in line with the national energy conservation and emission reduction and power industry development policy, to optimize the power structure, to promote the shutdown of small thermal units, improve energy efficiency, reduce pollutant emissions, improve regional environmental quality At the same time, it will further optimize the layout of Guangzhou holding power business, expand the scale of rights and interests, enhance the power business sustainable development capability. (Lei)
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.