"Head" to optimize share reform commitment to the stake will be injected wind power assets
Source: Internet
Author: User
The suspension of nearly 4 months of the company's shares today issued "on the optimization of corporate reform part of the special commitments and related transaction Plan Bulletin", the company will be injected wind power, such as clean energy assets, replace the existence of the risk of small thermal firepower assets and can not develop oil shale development projects. The shares of the company suspended from March 19 are trading today. According to the announcement, the actual control of the company's shares of electricity Investment Group agreed to its subordinate baiyin China's wind power company Jilin Thai 51% shares and Jilin Mileage Association 51% Equity, transfer to Kyrgyzstan shares; After the transfer of wind power assets, The major shareholder Jilin Energy Transportation Corporation will no longer transfer its shareholding in the Siping joint venture to 35.1% by the way of fulfilling the commitment of share reform; At the same time, China Electric Investment Group will Jilin Thai, Jilin mileage Synergy Follow-up II, 三、四期 project to the development of Kyrgyzstan Electric shares, replaced by the failure to obtain the state authority of the final approval documents, The development of Huadian oil shale in Jilin province could not be transferred by Kyrgyzstan Electric shares. It is understood that in 2006, the large shareholder of Kyrgyzstan Electric shares in the total share-splitting reform program to make the sale of special commitments. But because the country "big pressure small", "the implementation of the policy of energy-saving power generation dispatching and" extension of protected areas on both sides of railway lines "has made a fundamental change in the injection of 35.1% equity of Siping Joint venture company and the development of the integrated project of Huadian oil shale in Jilin Province, and the two projects themselves have been unable to control risk factors. Therefore, the company's actual control and major shareholders can pay the total start of this optimization reform plan, to inject more high-quality wind power assets, optimize the original share reform commitment to support the development of listed companies. The proposed injection of the Thai wind power phase of the project installed capacity of 49,500 kw, the unit selection of 33 stand-alone units capacity of 1500-kilowatt of the wind turbine August 14, 2009 GRID-connected power generation; mileage synergy wind power phase of the project installed capacity of 49,500 kw, the unit selected 33 kw of wind turbine generator sets. On July 12, 2008, GRID-connected power generation, April 25, 2009 into Shangyun. The approved electricity price of both items is 0.61 yuan/kwh.
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.
A Free Trial That Lets You Build Big!
Start building with 50+ products and up to 12 months usage for Elastic Compute Service