Project background
At present, the construction of value-added services for telecom operators is mostly silo-type construction, and there are many problems, mainly embodied in the following aspects:
One, a variety of value-added services rapid development, value-added services construction model is divided into independent and cooperative construction. Independent construction by the operator to purchase the application software, Third-party software and hardware. There are two modes of cooperative construction, one is to provide application software, operators to provide hardware and third party software, the other is to provide hardware and software, operators are responsible for business access. The cooperation manufacturer's ability is uneven, the integration ability and the hardware maintenance ability is inferior, the shaft type platform increases gradually, has brought the very big pressure to the construction and the maintenance.
Second, the hardware equipment of the business platform is configured according to the maximum number of users during the planning period, which is wasteful to the hardware equipment, the hardware utilization ratio is low in the business system and the hardware resources can not be flexibly dispatched.
Third, each line of business needs to go through the software selection, assessment resources, hardware selection, procurement, implementation and other links. Business on-line process is long, time span is big, unfavorable to business development. Most of the equipment involved in the centralized procurement process, procurement time span is relatively large.
Solution
Huasheng days to become customers to build a unified cloud computing support platform (Hua Sheng days into an IaaS management platform) for business applications to provide a running environment, speed up the business online time. At the same time, the flexible virtualization architecture is adopted to realize flexible resource scheduling and improve resource utilization and investment efficiency.
Overall management plan
123 Next Page