Low power supply and demand in southern five provinces

Source: Internet
Author: User
Keywords Supply and demand unit province
Tags agency balance basic company consumption demand power supply
China News Agency, Guangzhou, January 11 (Wang Hua Lanwang) The power supply and demand in the southern five provinces is complex and tight, although Guangdong to maintain the basic balance between supply and demand, but Yunnan, Guizhou have power gap, the southern grid is increasing energy coordination to protect power supply. Due to the recent low temperature, water 偏枯, coal tension and other factors, the southern five provinces and regions of power supply and demand more complex and changeable.  In the January, the power supply and demand balance of Southern power grid is tight, and there is still a gap in electricity consumption between Yunnan and Guizhou provinces. Southern Grid company said 11th, the current five provinces and regions continued to recover, electricity demand will continue to rebound, the overall increase in growth, but may appear "before the high and low" trend. But the electricity supply aspect, five provinces and regions new unit more, but water, coal, oil, gas and so on one energy supply more tense.  At present, the water level of major reservoirs is generally lower than normal year, it is expected to come to the flood season will still be serious 偏枯; electric coal supply to "small coal to protect large electricity" situation is difficult to change, especially small coal mine safety rectification and other factors, coal supply needs to be highly concerned. According to the introduction, the southern Grid company is currently "five tubes" to ensure the balance of power supply and demand in five provinces: to increase the energy coordination, improve an energy early warning mechanism, urging the power generation enterprises to increase the strength of coal storage, to avoid the lack of coal caused by the large area of downtime. Through perfecting the trans-provincial trading mechanism, enriching the transaction mode, strengthening the supervision and examination, coordinating and adjusting the fire-water resources and the provincial power transmission. and the market analysis technology system, the timely tracking analysis of power supply and demand situation changes, optimization of the east-west transmission channel overhaul plan to ensure that Ba Chichi kv Yun Guangte HVDC project double pole in June 2010 before the end of the operation. To strive for the implementation of the financial subsidy policy, and strive to Guangdong 9E unit as far as possible in the supply of peak power generation. Finish)
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.