Ming Yue Wan Protection house was demolished: housing always calls for state-owned enterprises as the main building
Source: Internet
Author: User
KeywordsState-owned enterprises the total
Jing Procter and Gamble October 9, 2010, Beijing's first quality problem was ordered to demolish the reconstruction of the housing project-Daxing Ming Yue Bay Security housing project officially launched the demolition process. This is not the first housing problem in Beijing. 2009 Beijing's first limit house project-Xisanqi Rui Flag home, is the wall of the balcony is crispy, concrete quality unqualified, by netizens jokingly called "the wall brittle." Coincidentally, both of the contractors are Beijing living Group of the company. "For this matter, I can't eat, can't sleep." "Beijing Live General Group chairman Zhang Guilin to our correspondent said," Out of such a thing is that we do not do a good job, we must carefully learn from the future, strengthen the construction management. "The collapse of the protection room as early as July 31 this year, Beijing construction construction Company announced criticism of the emergence of quality problems of the Ming Yue Bay security Room developers-Beijing Sun Moon Real Estate Development Co., Ltd. From May to July this year, Beijing conducted special inspections in the city. Beijing Municipal Housing construction project has issued a circular on this item, said that the Daxing District Building Administrative department in the Protection of Housing project supervision and inspection found that the project B, C District 8 residential projects appear concrete test block strength does not meet the design requirements of the problem. The project was subsequently ordered to cease work and the project was suspended for sale on the net. According to the introduction, inspection, the project in the application site is 5 to 9 layers, the inspectors to the completed site to the different degrees of random checks, that the load-bearing wall and other important parts of the concrete strength does not meet the design requirements of the possible. Beijing Municipal Housing Construction Commission related officials said, found that the quality of Yue Bay project, after the national Testing agency for the overall testing of the project, found that the project B, C District Engineering part of the structure did not meet the design requirements, by experts many times, design unit calculation review, can not meet the structural seismic requirements. In order to ensure the structural safety and to meet the function of residential use, it was decided to demolish B01, B02, B03, B04, C01, C02, 6 buildings on the ground structural part, the underground part of the structural reinforcement, B05, D01 Two buildings are partially strengthened. It was not until the demolition was ordered that the sensation was aroused. The Ming Yue Wan project is located in the northwest corner of the South five ring de Mao Bridge in Beijing, the construction scale is 200,000 square meters, the building is 11 floors to 18 floors, and is expected to be completed in June 2011, including affordable housing and commercial housing. The housing project by the Beijing Sun Moon Real Estate Development Co., Ltd. (hereinafter referred to as "sun and Moon Real Estate") investment and construction, Beijing live the second Development and Construction Co., Ltd. (hereinafter referred to as "live two companies") General contracting. Beijing Day and Day Hao Project construction Supervision Limited liability company supervision. It is understood that the average price of affordable housing in Ming Yue Wan is about 4300 yuan/square meters, and its commercial housing prices at 14000 yuan per square metre. And the problem is precisely the protection of the housing sector. Zhang Guilin told reporters that the cement is provided by the Beijing Sun Moon Company, and as party B, from the production point of view did not carry out timely testing of the hardness of cement test block, should be responsible for management. "Much lower than the market price of construction materials, certainly not produce high-quality products.""Zhang Guilin said. An executive of the central and central enterprises to the newspaper Reporter analysis that Beijing stipulates a number of new projects matching a certain degree of protection room. For some enterprises with insufficient funds, the protection of housing construction part, can only take desperate way, the oppression of material suppliers and builders to control costs, and finally damage the quality. Beijing Urban Construction of a branch, the person in charge of anonymity told reporters that the cost of cement per square meter about thousand yuan. Ming Yue Wan problems, in the construction process, is relatively low-level problem. Not just quality issues? For example, in Beijing, the Ming Yue Wan Security housing project is the third one to have problems. Last October, the Kwong Tung Mun Project-Chongwen District, No. 11th Building, 16th building, 23rd Building, 24th building four fetching house, found that there were leaks. Property staff have disclosed that does not include the pre-repair, according to incomplete statistics, there are 3,500 of leaks. The construction party in charge of the district, said that there is a "housing quality defects", the cause of the leakage may be the cross construction of the duration of the robbery. The project was dubbed the "house leak." This reporter to the field to Rui Flag home visit, the owner Zhang (alias) told reporters, living has helped its maintenance of the balcony. What bothers him is not just the quality problem. A series of supporting services have deficiencies. Because the property will be outside the Community kindergartens subcontract, the kindergarten exposed the price of 3000 yuan per month tuition fees. and living here every owner of the year when the application for limit room, there is the maximum household income limit, the project price is only 6300 yuan/square meters. Zhang said, because the district uses the independent heating way, feels the whole winter home is not warm. And although with the Huoying City railway station is close at hand, but did not build a passageway. Pedestrians must bypass the overpass or cross the railway, the road is very rugged. But there are also owners said that the "wall brittle" problem is only a few individual buildings, Rui flag home most of the quality of the building clearance. She even said that today some of the quality of commercial housing is not as good as the quality of the guarantee room. Sina Le home netizens expressed similar views on this, he thought that the demolition of Yue Bay, said the Government attaches importance to the protection of housing, "failed to dismantle the reconstruction." What is the quality of commercial housing? may not be as good as the security room, but the acceptance of the developers have been bribed, all qualified. For the protection of housing construction Jerry, dereliction of duty, should be mercilessly. "And for the quality of the housing, Beijing construction construction is mainly through random checks or relying on mass reporting to carry out quality supervision." It is understood that. In view of the possible quality problems in the inspection, Beijing Municipal Housing construction project has also made stringent provisions: the same residential projects in one year, such as two times have been found to have quality problems, building units and developers will be suspended to participate in the protection of housing projects to take the land, the construction qualification. Who will build the housing "I have always called for the state-owned enterprises as the main body of policy housing construction. Zhang Guilin said, he further explained that the state-owned enterprises backed by the government, in the policy room construction has a lot of advantages, not only to ensure the quality of the premise, but alsoEnough to complete the task, not to reduce costs, and cut corners. This time to live always leave the lesson is that after the private enterprises as party A, live as party B to build the model of the housing, the general principle will not do. Prior to that, living in the general 2009 has formulated a strategy to vigorously develop the housing market. At that time, Zhang Guilin has said, "Beijing has always been ready to get a 1 million square meters of protection housing projects this year." "Zhang Guilin said. In 2008, Beijing had a total of 3 projects, accounting for 1/8 of the market share. "The profits are meager, but they have to take a lot of risk." "Zhang Guilin said. The Green House Group (03900.HK), which has been active in the field of housing protection, has had such concerns. Greentown Real Estate Construction Management Co., Ltd. General manager Cao Zhou South had to this reporter said, do 100 projects if there is a project problems, it will make the brand bear huge risks, he believes that private enterprises can also build a guarantee room. But in reality, in order to ensure quality, greentown in some of the housing projects is required to "stick money" construction. In his view, when the government put the guarantee housing to the enterprise to complete, if always the loss of the state, not a long-term solution. China Building (601668.SH) Senior also told the reporter that the central enterprises should be the main force to protect housing construction. The central enterprise can mobilize the internal resources of the Central enterprise, give full play to the advantages of industrial chain, under the premise of quality assurance, control costs. Unfortunately, there are many developers also to the reporter said that access to the field of housing construction is not clear, the construction model is always changing, unfair, non-transparent competition occurs, despite the enthusiasm and financial resources, but not eligible to participate.
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.