Production scheduling software APS solution production Manufacturing Enterprise

Source: Internet
Author: User

1, the new product order, the old product order mixed row, the accuracy of the plan to the workshop and the hour, specific to the factory production plan and outsourcing plan.

2. Due to the balance of capacity in the "Short-term capacity assessment" phase, the capacity error of fine scheduling and "Short-term capacity assessment" is within manageable limits.

3. The purpose of Planning manual adjustment is to enable planners to modify the results of automated scheduling to a certain extent, making the plan more in line with the actual situation.

4. With the high speed and intelligence of the APS system, we can automatically distribute the order according to the capacity of each branch, so as to achieve the balance of total output and achieve the optimum production efficiency of each plant.

5, can and the existing ERP and future HR system can be very good connection and data interaction, real implementation of systematic management;

6, with the aid of APS system, improve the precision and fineness of the production, from the current unit of units scheduling to the future of the machine and hour scheduling.

1, able to quickly and easily adjust the corresponding plan

2, the use of the system and report to be simple and easy-to-use

3, to provide short-term and long-term capacity assessment, so as to achieve the current order and the choice of the next period of production 4, resource allocation planning

5, can support the processing of multiple BOM (the same product in different branch processing will have different product BOM)

6, can support the compatibility of mold

7, able to deal with the special requirements of new production

8, can support the first inverted row of the logic requirements

9, to support the new and old staff productivity differences in the impact of scheduling

10, to be able to carry out a certain capacity evaluation of suppliers

11, to support the network scheduling needs

The manufacturing production three production modes are:

1, small batch of many varieties, customer instability, and not adapt to the capacity of the assembly line production, at the same time, there is no inventory of finished products, production cycle is longer.

2, many varieties of production, production output is not enough to row a line, the warehouse has the appropriate inventory to meet the temporary needs of customers, but also reduce inventory in the system.

3, a large number of production, the entire inventory of the lowest, the smallest in the system inventory, short production cycle.

Yukon APS, to solve the scheduling problems that cannot be satisfied by ERP Http://www.yukontek.com,APS Production planning management expert 400-076-7600,021-68886010

Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.