Sichuan Qingxi building new House floor height difference 0.1 meters by the owner complained

Source: Internet
Author: User
Keywords Landlord new house High difference ya-built
Tags business check clear code company cost design design drawings
People's Daily [Weibo] Beijing March 11 (reporter 厉姣) "In the signing of the contract, specifically asked the staff, determined to be 2.9 meters?" The staff was very sure of the answer: Yes. The result now is that the height is only 2.8. "Recently, Sichuan" Qingxi construction "owners in the" Local Leadership message Board "to the party committee Secretary post, reflecting the new house entities and purchase contracts signed inconsistent, developers have not given a clear statement, the owners are very angry. Last week, the Chengdu Municipal Housing Authority said the reply, due to the sales department work negligence, in the process of sales of 4 of the price of 2.9 meters of commercial buildings signed a sales contract. 4th, 5 houses 2.8 meters high design drawings are approved by the planning departments, the construction also according to the review of the design drawings carried out, according to the "National Residential Design Code," The provisions of 2.8 meters high also to meet the standard requirements of qualified products. For the owners because of the high level problem, the housing and Insurance Center of Chengdu Municipal Authority to compensate for liquidated damages, there is no relevant laws and regulations, and the contract has not been related to the agreement, users can be resolved through legal means. At present, "Qingxi construction" owners have filed a lawsuit against the Qingyang District court to enter the judicial process. "Netizen message" I am a purchase of Qingxi ya build 4 price-limiting room of ordinary workers. After a series of cumbersome and complex purchase procedures, in full confidence in the government's behavior, with the mood of joy waiting for the house. It never occurred to me that the staff had discontinued 4 buildings because of the high level of the problem. When signing the contract, specifically asked the staff, determined to be 2.9 meters? The staff was very sure of the answer: Yes. The results now say that the level is only 2.8, (perhaps not so high), we also listen to the staff, said that will give us a plan, let us patiently waiting. All right, we'll wait. began to say that the end of October will be the plan, and then said that the beginning of November, and then the phone actually said it is the middle of November!!! Finally, in late November, we waited until the phone call, directly let us go to collect money??? Say is refund 3%, what is called refund??? Have you told the owner about the lower layer height? Has the owner agreed???? Is it charity or what? KFS (that is, our most trusted government department housing Authority) in the end what to do??? Both as an athlete and as a referee??? Have you consulted our opinion, we signed an agreement, not a contract of sale, with what KFS unilateral request, we accept, we have to accept??? Are you serious about the suggestions we have submitted????????? Please give us 4 owners a fair and just solution, hiding can not solve the problem!!!!!!! We want KFS to sit down and negotiate with us face-to-face, not cut!!!!! Reply Opinion: Chengdu Municipal Housing Bureau "reply opinion" Netizen: Hello! Your message reflects the problem, the Municipal Housing Authority attaches great importance to, after investigation and research, now reply as follows: First, the basic situation "Qingxi construction" project has a total of 14 houses, of which 12 of the building layer height of 2.9 meters, and the other 4th, 5 buildingsThe height of the building is 2.8 meters. Netizens bought "Qingxi ya Build" price-limit commercial housing in the 4th, due to the sales department work negligence, in the sales process of 4 of the price of commercial housing 2.9 meters high level signed a sales contract. 4th, 5 houses 2.8 meters high design drawings are approved by the planning departments, the construction also according to the review of the design drawings carried out, according to the "National Residential Design Code," The provisions of 2.8 meters high also to meet the standard requirements of qualified products. Second, the treatment of users reflected in the situation, the city Housing Insurance Center after the study based on the measurement of professional institutions, in the original 2.9 meters high housing prices on the basis of 3%, to determine the price of 2.8 meters high housing prices. The owner can also entrust with the municipal Housing and Insurance Center, employing qualified related cost consulting units to recalculate and produce the calculation report. If the price difference is more than 3%, municipal housing and Insurance Center in accordance with the difference of more than 3% to sign the supplementary agreement with the owner and refund; If the price difference is less than 3%, the municipal Housing Insurance Center or the landlord to sign the "supplemental agreement" with the owner of the 3%, and refund, calculate the cost and the owner because of the room The interest resulting from the purchase of multiple loans is borne by the Housing and Insurance Center of our bureau. For the owner due to the high level of the issue of the housing and Insurance Center for the compensation of the issue, there is no relevant laws and regulations, and the contract has not been related to the agreement, users can be resolved through legal means. At present, "Qingxi construction" owners have filed a lawsuit against the Qingyang District court to enter the judicial process. "Netizen message" I am a migrant workers, after more than 10 years of efforts, finally round the desire to buy a house, to buy a housing in Chengdu-Qingxi, but due to the negligence of developers caused by the actual level of the contract does not match, in the solution of a drag and drop, the final plan is not reasonable, I hope the relevant leadership concerns, Can really people's livelihood projects to answer comments: Chengdu Municipal Housing Bureau "reply" Netizen: Hello! Your message reflects the problem, the Municipal Housing Authority attaches great importance to, after investigation and research, the reply is as follows: First, the basic situation "Qingxi construction" project has a total of 14 houses, of which 12 of the building layer height of 2.9 meters, and the other 4th, 5 building storey height of 2.8 meters. Netizens bought "Qingxi ya Build" price-limit commercial housing in the 4th, due to the sales department work negligence, in the sales process of 4 of the price of commercial housing 2.9 meters high level signed a sales contract. 4th, 5 houses 2.8 meters high design drawings are approved by the planning departments, the construction also according to the review of the design drawings carried out, according to the "National Residential Design Code," The provisions of 2.8 meters high also to meet the standard requirements of qualified products. Second, the treatment of users reflected in the situation, the city Housing Insurance Center after the study based on the measurement of professional institutions, in the original 2.9 meters high housing prices on the basis of 3%, to determine the price of 2.8 meters high housing prices. The owner can also entrust with the municipal Housing and Insurance Center, employing qualified related cost consulting units to recalculate and produce the calculation report. If the price difference is higher than 3%, the city housingThe bureau's Housing and Insurance Center sign the supplemental agreement with the owner for a refund of the difference above 3%; if the difference is less than 3%, the city Housing Insurance Center or the price of 3% of the difference with the owner signed the supplemental Agreement and refund, the calculation of costs and the owner of the house after the room, resulting in more loans to buy the interest generated by my Bureau is responsible for the maintenance center. For the owner due to the high level of the issue of the housing and Insurance Center for the compensation of the issue, there is no relevant laws and regulations, and the contract has not been related to the agreement, users can be resolved through legal means. At present, "Qingxi construction" owners have filed a lawsuit against the Qingyang District court to enter the judicial process. "Netizen Message" Dear Secretary Hello! I am a citizen of Nanchong City, November 22, 2012 in Nanchong government guest house North Lake Hotel was Chengdu to Xiang Technology Co., Ltd. to cheat easy to check the key words deposit 17000 yuan, that night found to be cheated in Nanchong North Lake police Station alarm, to the Chengdu Municipal Bureau of Commerce and Industry and the Public Security Bureau by the Investigation Brigade has The liar company Chengdu faces Xiang Technology still continues to cheat, unscathed. In fact, this kind of company in Hunan TV station has already reported that http://www.tudou.com/programs/view/rlNbY-r2JhI/?resourceId=0_03_02_01 why they can openly cheat success in Chengdu. The industrial and commercial public security can not do? Personally, I think it is because there is no specialized agency to oversee and combat. Relying on the existing functional departments and laws and regulations on this new type of fraud crime is difficult to characterize, although now the power of the network is not small, but the pure network effect is somewhat feeble http://people.rednet.cn/PeopleShow.asp?ID= 1390373 such articles many, but easy to check the key words of the new fraud in all parts of the country cheat but often succeed, everywhere, the harm is great, the complain but the complaint without door, because they have business license, including industrial and commercial public security are aware that they provide is invalid products but nowhere to begin, Therefore, I propose to set up a special body to deal with this kind of new type of corporate fraud, they should be professional, encounter reports can not be prevarication, found a blow, so as to effectively purify the business environment, so that we SMEs can be assured investment! I hope the Secretary in his busy schedule to consider my proposal! Reply Opinion: Chengdu City Trade and Industry Bureau "reply opinion" Netizen: Hello! Thank you for your concern and support for the work of the government. Received your reflection Chengdu Xiang Technology Co., Ltd. Fraud business behavior problem, I immediately commissioned the Qingyang Trade and Industry Bureau is responsible for investigation and processing. After inquiring the file, the company registered address in Chengdu City Qingyang District Daqing Road 70th 1 Floor 11th, February 16, 2013 Qingyang Bureau appointed the law enforcement personnel to Chengdu Qingyang District Daqing Road 70th 1 floor 11th to carry on the scene inspection, did not see the company in this office. Cannot be contacted with the legal representative Wang Renjia. You reflect that the company suspected fraud is not within the scope of my Bureau, we suggest that you directly to the local public security organs report。 "Netizen Message" party secretary Hello, I am an ordinary college students, from the remote rural areas, participated in the second half of the 2012 Sichuan province, recently learned that the written test was the first good results, but also found that the date of their ranking has exceeded the eligibility of the review time, after the phone advisory helpless message. Rural communication is not developed, only when the market can go to the Internet cafes to check the results, the notice is December 29, and eligibility for review January 4, in the New Year's Day holiday, did not expect to be in this time period out of the notice. I apply for the position of only one person, only 3 participants in the eligibility review, plus other posts, the number of people who need to be notified is not more than 300 people, why not call notice. According to the staff of the Chengdu Personnel Bureau, it is now impossible to take part in the review because the personnel involved in the replenishment have already been notified. What's the point? There are people on the review list who do not give the opportunity to pay the trial, instead of notifying the candidates. I consulted the reference personnel, before the telephone, why has become the online notice, do not consider the vast number of poor students, please the party secretary to give me a reply. Reply Opinion: Chengdu City Person Social Council "reply opinion" Netizen: Hello! Your message reflects the problem, by the City Council investigation, now reply as follows: First, according to the "Chengdu Municipal Committee of the Communist Party of China, Chengdu Municipal Human Resources and Social Security Bureau of the second half of 2012 in Chengdu public examinations to recruit civil servants of the notice", to participate in the enrollment of the candidates " The written results and position rankings were published on the website of Chengdu Human Resources and Social Security Bureau, Chengdu Personnel Examination Center on December 29, 2012, and were published on the website of Chengdu Human Resources and Social Security Bureau and Chengdu Personnel Examination Center before December 31, 2012. In accordance with the above provisions, the CPC Chengdu Municipal Committee of the Organization department, Chengdu Human Resources and Social Security Bureau on December 27, 2012, 28th on the above-mentioned website published a written examination of the performance and position ranking and entry to interview qualification list and interview related matters. Second, according to the "CPC Party committee department, Chengdu Municipal Human Resources and Social Security Bureau on the publication of the list of eligibility to interview and interview related matters of the notice", candidates are not in accordance with the interview qualification review, as a voluntary waiver of qualifications. You fail to participate in the interview qualification review as required by the notice and shall be deemed to have voluntarily waived the interview qualification as stipulated.
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.