Sinopec Northwest Oilfield Branch oil field Development zone new well capacity construction effect is remarkable, see yield reached 96%, Nissan crude oil first broken 18,000 tons, this 1-April, Northwest Oilfield Branch has accumulated production of 2.1102 million tons of crude oil, natural gas 409 million cubic meters. Our correspondent in Xinjiang should Jiang, intern reporter He Hui, correspondent Zong Gang Sinopec Northwest Oilfield Branch to strengthen scientific research and technical force, exploration area increased by 10 times times. In the field of exploration, 4 breakthrough projects, 2 reservoir-building projects (three-dimensional exploration and storage in Tahe oilfield), an exploration project and 2 evaluation Engineering "4212" Engineering are fully implemented, focusing on "constructing tens of millions of tons of Tahe oilfield and promoting the strategy of resource replacement in the West". This science development view theme practice activity, vigorously organizes the exploration "4212" Project and the development "three raise One Drop" project, increases the storage production to obtain the stage result: the oil and gas exploration has discovered a batch of advantageous oil and gas target area, two newly-developed wells have obtained the high yield industrial oil airflow, four " Breakthrough zone "is expected to realize the new discoveries, has basically implemented more than 100 million tons of proven reserves, the completion of the three-level reserve mission is within reach." Effectively curb the decline of old wells Sinopec Northwest oil Field branch in Tahe 12 District, 10 district, Shevchenko evaluation area, such as the continuous deepening of production capacity, new well output contribution rate reached 7.4%, compared with the same period last year increased by 1.83%. The company has studied the reservoir and oil-water distribution and production dynamic characteristics of carbonate fractured reservoir in Tahe oilfield, a total of 298 seam units, according to the main production seam hole belt, the rolling development seam belt and evaluation seam hole belt to carry out the well location deployment, the new well accumulated production of crude oil 156,000 tons, see yield reached 96%. In the old well development, take the pumping, deep pumping, lower electric pump and other measures, such as overhaul, water plugging and other offensive measures, the measure efficiency of 81.83%, compared with the same period last year increased 3.1%, old well natural decline of the adverse situation is effectively curbed. It is understood that by the end of April, the company completed drilling 468,000 meters of total footage, 190,900 meters higher than the same period last year, drilling speed than last year increased by 17.7%, side drilling production rate reached 100%. The company is fully focused on the "4212" project and the "Three to One Drop" project. Sinopec's first large oil production plant, Northwest oilfield Branch oil production plant has been on April 19, ahead of the annual remaining Nissan level, Nissan crude oil reached 11,003 45 tons.
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.