Near-stage Company site Server instability, comprehensive consideration of the company decided to change the quality of better servers. But change the server is easy, but after changing the server some column debugging and SEO problem is we do not want to face and have to face the problem.
The relocation of the site if the processing is not easy to be the search engine down the right, may be included in the site of the reduction of the ranking of keywords, and so on. Before we are ready to migrate the site, the first thing we need to do is to backup the site, which is vital to the backup, the author of this trial is the imperial backup, this backup method is simple and relatively fast. As to how to use is not the theme of this article, the author is not in-depth discussion, we can then find a search for relevant information on Baidu.
The author of the company's site is an E-commerce site, the relocation of this site selected in the early hours, because at this time the number of visits is the minimum period. And the general site of the relocation of the revision we will choose to do in the early morning. When the time is right, we start migrating sites. First we upload our website program, and then use the Empire Backup to restore the site's data. Migration is simple, so it's OK. However, after the migration of the site is not the same as before, the site may have server problems or a layout dislocation and so on. For the site layout results problem we need to the site code for certain debugging. The author in this migration to is not encountered page dislocation problem, but the server's permissions. Our new server is using Linux, and the following code appears at the top of the site after the migration. First set permissions, set permissions to 777, but the problem persists. As shown in the following illustration:
Tried several methods, finally found the problem, the original is the server in the PHP.ini setting problem, in the setting output_buffering default is off state, the author enabled to on state, while he modified to output_buffering= 4069, and finally reboot the server, the permission warning disappears.
The final step of the migration is testing, the test for E-commerce site migration is more important, the author tested the registration account, the order, payment, and so on a series of links. There is any error in the timely modification, so as not to cause bad experience to users.
Then we need to face site migration to the site's SEO impact. So how do we minimize the impact? I simply share some of the experience in the migration process.
1: Site migration, site problems should be modified in a timely manner, to avoid the second site bones.
2: After the site migration, the original content of the supply should keep up, but the site has content information to remain mobile.
3: After the migration needs a certain high quality friend chain to drive the site, if necessary, you can make appropriate links to buy.
4: After the site migration, should be appropriate in our site to do some online activities (for E-commerce sites), so that the site more active.
Because the site's migration is not like the site revision that needs to be a big bones site, so only we pay attention to the details of the site transfer, the general site of the impact of SEO will not be too big.
This is the author of this time for the company site migration, I hope that for everyone in the relocation of the site to help. This article by the 2013 latest film http://www.2012dy.com/edit, reprint please keep the source.
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.