Intermediary transaction http://www.aliyun.com/zixun/aggregation/6858.html ">seo diagnose Taobao guest cloud host technology Hall
Recently had the opportunity to participate in a university campus BT resource station Operation Group, and the team to run this new station. Today, I will talk about some ideas about this kind of station operation.
This is a campus station, the campus LAN environment for doing this kind of website is very advantageous, the local area network between the client transfer things quickly. In daily life, watching movies and serials is one of the best ways to entertain students. Operating such a website, the operator must have the following conditions.
I. Campus Server working environment
This, must understand the server room environment and some school systems, such as power outages, broken nets and student schedules, the server should be synchronized with the school, that is, students can access the Internet while the Colonel's BT station.
Two. Access to external and school resources
As a BT resource station, it is necessary to have enough resources that can be continuously updated, which will test the resource channel of operation. Campus BT Station and the traditional BT station has one of the biggest difference is that the campus of the BT station, resources are in the school local area network server and client. The traditional BT station can be seed-sharing, and the school must be the seed in the campus server. Therefore, this also has a channel and the space problem needs to solve.
Three. Transfer of resources
The resources on campus must be brought in from outside school or downloaded directly from campus (this must have enough bandwidth to support the updated resources on a daily basis). The transfer of resources is also a big problem in running such a station. It is not easy to do the quickest and newest. Need operators to carefully ponder.
Four. Release and update of resources
After the resource is on the campus resource server, what the publishing group must do is to do the kind and then post the update.
Five. Website construction
Website design and construction must be based on user experience, this and the traditional Web site is no different, as a BT station, the first thing to do is more content and not disorderly, classification to fine, the home page to display the resources to be clear, this in fact there are many related to the online program can be used directly. The key is to see more statistical data, do more analysis, and strive to make easy access to users.
Vi. Interaction of website users
The campus website, has the very strong interactive potential, certainly, the excavation work must be responsible by the operating party. Engage in activities is necessary, post posting is also necessary, communication is also necessary. It is not easy to do this, the key to see the operation of the organization's planning capabilities.
Seven, operating cost control
The campus resource station, there is a big drawback, is the storage of resources, because all resources must be in the local area network, so the resource server usually needs a lot of hard disk space, often a few t dozens of T, how to control the growth of resources and continuous update is the operator must solve a contradiction.
The above other conditions are the author of this station since the experience of their own. I hope I can help you. Because it is simple, so all is simply explained, and so on when the station really do up to a more detailed discussion.
The next article I will talk about doing the campus BT station to promote the way.
Lin Changfen 2009.09.22
This article by Lin Changfen starting in the website to Promote learning Blog (http://www.linzhangfeng.com), reproduced please retain the source.