The commercial operation of the Shidao Bay Nuclear power project was first approved

Source: Internet
Author: User

News (reporter Zhang Yijun) According to the National nuclear Power http://www.aliyun.com/zixun/aggregation/17703.html "> technology company insiders revealed that recently, Located in Rongcheng, Shandong Province, the Shidao Bay nuclear power CAP1400 type PWR project has taken the lead in getting "flagging" authorized to carry out the prophase construction work of nuclear power plant, including the foundation pit negative excavation.

The approved CAP1400-type PWR project, different from last December 21, the construction of high-temperature gas-cooled reactor demonstration project. "The high temperature gas-cooled reactor is only 200,000-kilowatt, mainly for the four-generation nuclear power technology industrialization test." "Shandong Provincial Academy of Sciences, deputy Director of the Institute of Energy Xu Chongqing to the Economic Herald reporter explained that CAP1400 type PWR project is the Shidao Bay Nuclear Power plant expansion project, mainly for commercial operation."

It is understood that with the national nuclear Power technology company cooperation CAP1400 type PWR project, single capacity of 1.4 Million-kilowatt, using the AP1000 technology (third generation nuclear power technology) route. The long-term planning capacity of the Shidao Bay nuclear power plant will reach 9 Million-kilowatt and the construction cycle is 20 years.

Shidao Bay to get "flagging" released this year's nuclear power construction speed signal. The National Development and Reform Commission 5th brought to the National People's Congress on the implementation of the 2012 national Economic and Social development Plan and the 2013 draft plan for national economic and social Development, the 2013 "New nuclear power 3.24 Million-kilowatt". "3.24 Million-kilowatt means that 3 units may be fully operational this year," he said. "Xu Chongqing said.

It is understood that has entered the grid-connected commissioning phase of Fujian Ningde No. 1th unit and Liaoning Red River 1th units, according to the plan, the two million-kilowatt-class units will be fully operational this year.

The above-mentioned national nuclear power technology company insiders, this year, there are 6 units may get "flagging", including Shandong Haiyang Unit 3rd, Zhejiang sanmen 3rd unit, Fujian fuqing 5th unit, Guangdong Yangjiang 5th unit, Guangdong Lufeng 1th Unit and Liaoning Xu Daburg nuclear power unit 1th.

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.