The growth of sulfur dioxide emissions caused by the rapid growth of steel and petrochemical industry in the previous April

Source: Internet
Author: User
Keywords Steel emissions too fast
Tags .mall demand energy-saving environmental environmental protection group installed installed capacity
BEIJING, May 13 (reporter Pan Shaojun) today, "the Ministry of Environmental Protection implementation of the State Council to implement energy-saving emission reduction work of the Conference" to demand all over the implementation of annual emission reduction plans, while grasping the following key emission reduction projects: new urban sewage treatment capacity of 15 million tons,  New coal-fired power plant desulfurization installed capacity of 50 million-kilowatt, shut down small thermal units 10 Million-kilowatt, the elimination of backward production capacity, respectively, iron 25 million tons, 6 million tons of steel, cement 50 million tons, electrolytic aluminum 330,000 tons, flat glass 6 million boxes, paper 530,000 tons. According to the introduction, "Eleven-Five" since, China's pollution emission reduction work is progressing smoothly, but this 1-April, China's power, steel, petrochemical and other resource-oriented industrial product production growth was too fast, resulting in sulfur dioxide emissions increased by 1.2%; Due to drought, Guangxi, Yunnan, Guizhou and other southwestern provinces (autonomous regions) decreased hydropower, thermal power explosion , sulfur dioxide emissions have rebounded sharply.  Environmental Minister Shengxian stressed that this year is a crucial year, to fully see the current pollution reduction work complexity, the arduous nature, no matter how difficult, determined not to waver, work not weakened to ensure that the "Eleven-Five" pollution reduction targets. According to the 2009 annual National emission Reduction assessment results, decision from the date of publication, on the urban sewage treatment, desulfurization facilities, such as the construction and operation of the outstanding problems in Heilongjiang province Shuangyashan, Zhejiang Province, Wenzhou, Hunan Province, Lianyuan Iron and Steel Group Co., Ltd. and other regions and enterprises, to take the suspension of construction projects, such as environmental assessment of the five measures To Tianjin Binhai New Area Dagang oilfield Port East sewage treatment plant, Shanxi Luliang Municipal Wastewater Treatment Plant, Shanxi Province Datong Development Zone Wastewater Treatment Co., Ltd., Jilin Province Tonghua sewage Treatment plant, Huzhou city, Zhejiang Province light water quality Purification Co., Ltd, Hunan Changsha Liuyang Sewage treatment plant, Guangdong province Zhaoqing Sihui Wastewater Treatment Plant, Sichuan Yibin Wuliangye Group Co., Ltd. Sewage Treatment Plant implementation of the listing supervision, the deadline for rectification; to Hubei Province Cheng Steel Limited liability company, Sichuan Province Dazhou Iron and Steel Group Limited liability company to carry out the listing overseeing.
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.