As a growing scale of securities service enterprises, the first venture in the Enterprise Data Center Construction Road, experienced from scratch-gradually sound-multiple centers run three stages. By 2010, the company's rented third party data center is clearly unable to meet the rapid development of the company's business, with geometric data growth of the number of cabinets and IT managers need to build a high level data center, so the company decided to set up in the first venture building to set aside a whole layer of space for the Self-built data center. As a highly available http://www.aliyun.com/zixun/aggregation/13543.html ">it service provider, the universal data, in the face of the need to build high grade data centres for customers in commercial buildings, With mature technology and professional team creatively proposed to adapt to local conditions to build the first business-oriented customized data center program.
Under the organization of the data of the world, the two sides in three months after 12 meetings of the efficient communication, in response to a number of technical issues breakthrough. In particular, the most intractable power solutions, the universal data mobilization to participate in the construction of its own data center senior engineer to participate. Finally, based on the existing conditions of the building, the high grade design scheme submitted by the universal data won the recognition of the first venture, and also coordinated the maximum distribution of power resources throughout the building, ensuring uninterrupted and steady operation of the data center.
The data center is not limited to the precision equipment area, application system room area, wiring area, communication area, distribution area, monitoring office area, fire fighting equipment area, testing area, etc. Design work includes building plane, power supply and distribution system, HVAC system, intelligent system, water supply and drainage system, fire protection, lightning protection subsystem. In the GDS consulting team's plan, the "My" data center meets the operational requirements of the first venture's existing information system and takes full account of the development and application needs of the first pioneering IT system in the next 5-10 years. In the design, the universal data also took into account the new data center visit needs, to help the first venture to customers or industry peers to fully demonstrate the first pioneering securities information infrastructure advanced results.
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.