Java for LeetCode 225 Implement Stack using Queues

來源:互聯網
上載者:User

標籤:

Implement the following operations of a stack using queues.

  • push(x) -- Push element x onto stack.
  • pop() -- Removes the element on top of the stack.
  • top() -- Get the top element.
  • empty() -- Return whether the stack is empty.

Notes:

  • You must use only standard operations of a queue -- which means only push to back, peek/pop from front, size, and is empty operations are valid.
  • Depending on your language, queue may not be supported natively. You may simulate a queue by using a list or deque (double-ended queue), as long as you use only standard operations of a queue.
  • You may assume that all operations are valid (for example, no pop or top operations will be called on an empty stack).

Update (2015-06-11):
The class name of the Java function had been updated to MyStack instead of Stack.

解題思路:

用Queue的執行個體LinkedList實現,JAVA實現如下:

class MyStack {LinkedList<Integer> queue;MyStack() {this.queue = new LinkedList<Integer>();}// Push element x onto stack.public void push(int x) {queue.add(x);}// Removes the element on top of the stack.public void pop() {queue.remove(queue.size()-1);}// Get the top element.public int top() {return queue.getLast();}// Return whether the stack is empty.public boolean empty() {return queue.isEmpty();}}

 

Java for LeetCode 225 Implement Stack using Queues

聯繫我們

該頁面正文內容均來源於網絡整理,並不代表阿里雲官方的觀點,該頁面所提到的產品和服務也與阿里云無關,如果該頁面內容對您造成了困擾,歡迎寫郵件給我們,收到郵件我們將在5個工作日內處理。

如果您發現本社區中有涉嫌抄襲的內容,歡迎發送郵件至: info-contact@alibabacloud.com 進行舉報並提供相關證據,工作人員會在 5 個工作天內聯絡您,一經查實,本站將立刻刪除涉嫌侵權內容。

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.