Eclipse BPEL Designer的計劃

來源:互聯網
上載者:User
BPEL Project Sync Up Calls

 

Last modified on December 11th, 2006

The next sync up call will be on January 5th, 2007 @ 18-19 CET or 18-19GMT or 9-10 PST or 12-1 EST.

US/Canada 1-888-967-2253
Asia Pacific 1800 222 712 (Australia toll-free)
800 9491 2777
61 2 8817 6100
EMEA region 44 118 924 9000
Meeting ID: 288052
Password: 2468642

 

Dec 15,2006 - BPEL Project, call summary
  • ❑ BPEL Call, December 15th, 2006
  • ❑ People Present
    • ❑ Michal, Bruno, Simon
  • ❑ Status
    • ❑ Michal: Property sheets issue, resize

      • ❑ Attended website school
      • ❑ Worked some on the XPath editor and Validation, but not much too report.
    • ❑ Simon: forEach support in editor, message exchange added.
      • ❑ forEach support
      • ❑ message exchange added.
      • ❑ more support on the way.
      • ❑ need to remove switch/case, add if-else.
      • ❑ Clean up categories for new project and new file wizard.
    • ❑ Bruno:
      • ❑ Not much to report.
      • ❑ In January release active 3.0 runtime.
      • ❑ PDD generation for more tomcat versions.
  • ❑ M2 Release
  • ❑ ToDo Next:
    • ❑ Remove fn.xml dependencies Collaxa.
    • ❑ Release 0.0.2 (M2)
    • ❑ Push BPEL 2.0 compliance till M3.

 

Dec 1,2006 - BPEL Project, call notes

Topic Who
❑ Meeting attendees  
❑ Bruno, Michal, Simon  
❑ Topic  
❑ Status  
❑ Simon  
❑ ForEach , perhaps for Dec 15  
❑ Right now redoing the EMF model to full 2.0  
❑ Bruno  
❑ Active BPEL 3.0  
❑ Michal  
❑ XPath editor.  
❑ Issues  
❑ No version numbers on dependent plugins.  
❑ Minor bug on new project/new file wizard.  
❑ Next Steps  
❑ Shoot Dec 15 M2* Build (include 2.0 changes).  
❑ December 24, final.  
❑ Summarize web site configuration for local editing. Michal
❑ December 7, eclipse status reporting call (Michal). Michal
❑ Next Dec 15, same time, same place.  

 

 

Nov 10,2006 - BPEL Project, call summary
  • People on the call.

    • Simon Mosner (IBM)
    • Bruno Wassermen (Univ.of.London)
    • Kable (Attachmate)
    • Michal Chmielewski (Oracle)
    • Rodrigo Peretti (IBM)
  • Update of progress
    • Bruno Wasserman 0.0.2 Runtime, framework, select and deploy modules, active BPEL, but it looks like there is some magic to deploy to Active BPEL 2.1
    • Simon Mosner, not much work on open source, Busy.
    • Michal, XPath editor (90%), Validation (in flight).
  • M2 release
    • When XPath editor is done, we could call it M2. Prompters are done, XPath editor is done.
  • Resource Commitments
    • IBM

      • Simon + 2 people.
    • Oracle
      • Michal + 1 people.
    • OMII, Univ of London
      • Bruno
  • JBOSS or Sybase
    • Nothing much happening there.
  • Attachmate
    • Kable indicated that there is interest, might be able to contribute resources.
  • Mentor - we had no idea we had one ...
    • John Duminovich, will send e-mail with status and update (Michal)
  • Work distribution, asking for help.
    • IBM said that they were interested in getting other people involved beyond the original players. Will proceed with interest from Stutgard University.
  • Next Action
    • 2.0 spec activities. (?)
    • Stutgard University phd students involvement (Bruno)
    • Finish 2.0 spec compliance on the editor, model, UI (?)
    • JBOSS might have a 2.0 engine, Active 3.0 might have one too, those would be key to provide integration points.
    • Missing forEach activity in 2.0, Simon has agreed to contribute in 2 weeks or so.
    • 2.0 model work might be done by interested parties in Vienna.
    • XPath editor by end Nov (Oracle)
    • forEach by end of Nov (IBM)
    • Model work by Univ. of Vienna Ph.D students (Bruno)
    • Update the website with progress and call details (Michal)
    • Friday Dec 1, next call, Same call in numbers, same time.

Call dial in details for anyone interested in dialing next time. We will be using exactly the same numbers on December 1, 2006.

--------------------------------------------------------------------------------------------------------------------------------------------------之前作了很多工作,使其部署到ActiveBPEL 3.0的引擎上。但是Eclispe Designer 還是有很多不符合WS-BPEL2.0的標準,終於看見要remove swirch/case add if/else了。

聯繫我們

該頁面正文內容均來源於網絡整理,並不代表阿里雲官方的觀點,該頁面所提到的產品和服務也與阿里云無關,如果該頁面內容對您造成了困擾,歡迎寫郵件給我們,收到郵件我們將在5個工作日內處理。

如果您發現本社區中有涉嫌抄襲的內容,歡迎發送郵件至: info-contact@alibabacloud.com 進行舉報並提供相關證據,工作人員會在 5 個工作天內聯絡您,一經查實,本站將立刻刪除涉嫌侵權內容。

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.