Oracle RAC Database 11.1.0.6 listening fault case
After receiving a call, the customer's core Oracle RAC database cannot be connected, and no listening program is available at the time of connection. The customer's Oracle RAC version is 11.1.0.6 and
Using Web Sphere Edge Server to build Load Balancing for cold rolling Systems
A user's ERP system has been running for eight years. The Cold Rolling Workshop system has been running for nearly five years. Its core business system is the cold rolling
Different Nic mtu values cause rac 2-node ASM not to start ORA-27550 at the same time: Target ID protocol check failed., mtuora-27550
After installing 10205 rac, prepare to configure asm dg and find that ASM on node 2 cannot be started:
En12 is a
In SQL Server, when a database is started, SQL Server creates a corresponding Task scheduler (Scheduler) for each physical CPU (including physical CPU and hyperthreaded), and Scheduler can be thought of as a logical CPU (Logical CPU).Depending on
First, the contents of the experiment:Pair programming. Run TCP code, pair, one-person server, one-person client; Use encryption and decryption code package, compile and run code, one person encryption, one person decryption;Integrated code, sent
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.