support for modeling, and it is not convenient to debug data during programming.
Based on the above introduction, we can see that although there are already a considerable number of database management software at home and abroad, there is not one suitable for our platform. Therefore, we have integrated the advantages of various database management software at home and abroad to make up for their shortcomings and designed our own database management plug-ins. Our plug-ins support object-oriente
Order Management is an important module in the ERP system, the customer orders, the ERP through the order to the customer distribution. The order module mainly includes order creation, order modification, order review, order cancellation, order distribution, order printing, order picking, and order out-of-stock. In the following sections we look at how each of th
ERP Software database overwrite data recovery success/Reload database system software, resulting in file overwrite with same name"Data Recovery failure description"A hotel in Shanghai ERP software was originally installed on the C drive, the user mistakenly operation to uninstall the software, found that the software has not,But before the operation did not copy
In the development process of ERP system, or use I prefer to say, in the production process of ERP, a lot of operation is the flow of data, data operation, data continue flow, this similar pipeline data processing,For example, the processing of orders, to go through order fetching, order status check, order Financial Review, Order manual review, order logistics n
system is slow often we want to comprehensively analyze the dimensions provided in this article:
Business pressure
Hardware
Environment
Code
Operational factors within the database
Architecture
Often optimization is really not a simple tune statement, add a hardware, comprehensive analysis is the primary task of solving performance problems.Of course not all the optimization can be completely solved, such as the impr
Exception handling module is a large system must be a component, well-designed exception handling module can improve the robustness of the system. Let's talk about all aspects of exception handling from the perspective I understand. My design is only limited to Windows Forms for reference.1 Defining exception typesThe. NET framework defines a number of exception types, and we add some custom exception types
The company's existing ERP, CRM, OA, HR, SCM, PLM and other management systems docking public platform servicesMethod 1: Open InterfaceEnterprises open existing system data interfaces to third parties, or by third parties to develop data interfaces to connect to public platformsMethod 2: Get the databaseThe enterprise's existing system supports third square acces
Recently, the company has been upgrading its ERP products.
The choice of architecture is very tangled. The original system is in the CS architecture and is in the fat client mode. Install the client when installing the clientProgramAnd. NET Framework, and install diapi, database access components, and even excel components. In order to install the software, a special folder named "taixin software installat
The documents of ERP system have standard function, the documents here can be translated into bill,document,entry and have similar tool-bar operation interface. By designing reusable base classes, subclasses only need to inherit the base class form to complete the design of the document function. First look at the standard Sales contract document interface:This article through the Sales Contract document fu
5.1 three elements of time
The MRP system can plan the priority and control the whole manufacturing process, because it has some different understandings and processing methods on the concept of time and the traditional manual management. MRP is an information management system that focuses on planning and control, and uses the ratio of planning to control as a
system super Administrator
Insert into user_info (userid, password, role) values ('admin', 'admin', 'supermanager ');
Insert into kf_info (ID, khbh, XM, DH, sfz, DZ, pslx, kfjlsj) values ('1', '1 ',**,'*', '********', 'hn ', 'pslx', 'kfjlsj ');
Insert into cpvalues ('1', 'mf ');1.2.3 coding design 1.2.3.1 front-end page design 1.2.3.2 Background Program Design
1.2.4 test design 1.2.4.1 business function test 1.2.4.2 user test 1.2.5 launch and O M
In practical applications, users may need to record the ERP password and do not want to enter the password each time they log on, just like QQ.
Below is the code for C:
REFERENCE The following namespace first
using System;using System.Collections.Generic;using System.Linq;using System.Text;using System.Management;using System.Windows.Forms;using System.IO;using System.Xml;using System.Xml.Linq;
The Code is
vitality, ordinary processes, services and efficiency, has been far from meeting the changing and personalized needs of users. Zhibang international version 31.85 is based on its profound insight into the development trends of the times and enterprises, as well as its successful practices for serving millions of users. Based on its powerful standardized functions, continuously expand personalized management scenarios and boundaries to bring a more flexible and efficient management experience, T
can be verified before the data is saved or deleted before the value is changed, and we complete this complex validation logic through the entity invocation.Based on the definition of the previous department table, find the system metadata to know that the entity it maps is departmententity, we construct departmententity based on the values of the data table, the Excel data in the table above has multiple lines of records, A listWe actively invoke th
The springbird ERP system quick development platform is based on a common three-tier architecture. The data access layer adopts the ibatis.net without SQL Injection risks, the presentation layer adopts Microsoft's latest Asp.net mvc3 razor template parsing engine and lightweight jquery easyui. The service layer adopts interface programming, the mature and reliable IOC and AOP framework spring.net are used t
hurriedly called and asked, "I am Li Tai. Why didn't I order the roast duck ?" (Procurement outsourcing ticket Reminder)
"Sorry, the shipping person has already left. It may be a traffic jam. It will arrive immediately ."
The doorbell rings.
"Mrs Li, this is your roast duck. Sign one word on the ticket ." (Acceptance, warehouse receiving, transfer to account payable)
At, my daughter called: "Mom, can I bring some friends home for dinner now ?" (Oh, it's an urgent order intention, and th
Silverlight Large management system source code (support for the creation of ERP, OA, CRM, HR, invoicing, finance and other systems)Can be used to develop the following systems
Silverlighterp
Silverlightcrm
Silverlighthr
Silverlight Financial Software
Silverlight Management System
Silverlightoa
Due to the external confidentiality of the pro
The following lists the material master file views:
Fs_item
Itmb (main object and Material file) and the unique data of the object and material protected on the off-screen.
Column name
Data Type
Duration
Concise description and valid values
Itemnumber
Varchar
30
Unique generation codes of components, such as work tools, raw materials, configuration, Work Center
Itemdescription
Varchar
70
Zero part nu
After the purchase goods are finished, the next step is to carry out the warehousing operation. In order to achieve fine management, warehousing operations are mainly divided into the following several steps, purchase arrival confirmation, procurement, warehousing completed. Now let's see how these steps are implemented.1. Arrival Confirmationwhen the goods arrive at the warehouse, the consignee of the warehouse should confirm the receiving operation. After the warehouse confirms receipt is comp
5.2 Early Stage
The material demand plan is a demand-oriented reverse plan based on the delivery date or completion date to calculate the start date of the work or the order release date; the time span in this period is called the "lead time", which means the number of times in advance to start the action and the countdown.
MRPIn the system, there are3Layers.
The time for signing a customer's order to deliver the goods to the customer is called
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.