cisco 3850 switch stack configuration

Discover cisco 3850 switch stack configuration, include the articles, news, trends, analysis and practical advice about cisco 3850 switch stack configuration on alibabacloud.com

Cisco 3750 switch stack configuration points

Cisco 3750 switch stack configuration points 3750 stack is a real stack, the Catalyst 3550 series uses StackWise technology, it is an innovative stack architecture, A 32 Gbps

Configuration example of cisco router and layer-3 Switch environment, cisco layer-3 Switch

Configuration example of cisco router and layer-3 Switch environment, cisco layer-3 SwitchSimple environment configuration instance for cisco router layer-3 Switch I. network topology:

Cisco switch cluster technology: scalable stack architecture

Investment Protection and Development Options With the development and changes of the Enterprise, you can leverage the Scalable Cisco stack architecture to ensure the synchronous development of your LAN. Cisco provides the industry's most flexible, scalable, and manageable stacking architecture for the Catalyst 3500 XL series and the Catalyst 2900 XL series switc

Cisco (Cisco) switch Configuration chapter "two"

Previous page Everyone talked about Cisco Basic Operation command switch, while dragon boat holiday, the Cisco simple switch configuration, and hope you share "Happy Dragon Boat Festival"! Ok, configure the switch, first, you must

Introduction to Cisco 3750 switch Stack

, and the slot number is different) Iii. Stack instances: 1: The stacked cables are physically connected. The connection method is master stack1, which is connected to slave stack2. 2: enable the master without any configuration. . 3: Server Load balancer is enabled. 4: No configuration is required. Line plug, automatic stacking election upon startup, master is h

Switch: instance for VLAN configuration of Cisco L3 switch + L2 Switch

An instance of VLAN configuration for Cisco L3 switches and L2 SwitchesCisco VLAN implementation is usually port-centric. The port connected to the node determines the VLAN in which it resides. There are two ways to allocate a port to a VLAN: Static and Dynamic. The process of creating a static VLAN is to forcibly allocate the port to a VLAN. That is, we first create a VLAN on The VTP (VLAN Trunking Protoco

CISCO 3750 Dual Switch stack operation, cisco3750 dual

CISCO 3750 Dual Switch stack operation, cisco3750 dual Double switch stack operation I. Basic Requirements: The ios version must be consistent with the dedicated stack module and stack

Analysis of Cisco layer-3 Switch stack connection

The Cisco layer-3 switch is another core switch developed by Cisco. It aggregates the bandwidth of the backboard of the switch that is stacked together, in this way, the total backplane of the switch

CISCO router & amp; Switch SNMPv2 configuration, cisco Router

CISCO router switch SNMPv2 configuration, cisco Router Cisco router SNMP Configuration Snmp-server community CQGASPZW-R RO // ro read-only Snmp-server trap-source Loopback0 // use the loopbackaddress as the source address of the

Network devices-Cisco-Switches (example 3750) stack end configuration Chapter

Must use a dedicated cable Example of a fool-type configuration:1: Physically connect the stacking cable, the connection method for Master's Stack1 is connected to the slave stack2 above. See2: Open master, do not make any configuration. And so on after the full boot.3: Open the slave machine.4: Do not make any configuration. (line plug good, power on a

Cisco Cisco switch VLAN configuration Tips

Technical standards for VLANs IEEE 802.1Q was formally promulgated by IEEE Commissioners in June 1999, and the earliest Vlna technology was proposed by Cisco (Cisco) companies in 1996. With the development of the past few years, VLAN technology has been widely used in large and small enterprise networks, becoming the most popular Ethernet LAN technology at present. This article is going to introduce one of

Differences between Cisco switch cascade and stack

Cascade is connected to another hub through a port of the hub (for example, uplink), and stack is connected through the hub backplane.Stack is only available between devices of your own manufacturer, and the device must have a stack function. Cascade a single twisted pair (or other media) requires a dedicated Stacking Module and cable, and these devices may need to be separately purchased. although cascade

Basic configuration and Telnet login via Cisco emulator Cisco PACKET Tracer Learning Network 2--switch

, adding switches and end devices1, double-click switch into switch command line (CLI) mode, switch configuration mode by command2 in most cases for security reasons, you need to configure the switch privileged mode passwordValidation test3 Configuring the telnet login switc

Cisco (Cisco)-Switch initialization configuration

(global configuration mode)S1 (config) #interface vlan 1 --Enter VLAN 1 PortS1 (config-if) #ip address 192.168.1.1 255.255.255.0 --Configure the vlan1 with an IP address so PC1 and S1 can ping interoperabilityS1 (config-if) #no shutdown --activating VLAN 1 PortS1 (config-if) #end --Return to privileged modes1#copy running-config startup-config --Save configuration (from memory RAM to hard disk NVRAM)s1#sh

Basic commands for Cisco switch configuration

(config-if) #switchport Access VLAN 2SWA (config-if) #int F0/6SWA (config-if) #switchport Access VLAN 2SWA (config-if) #int F0/7SWA (config-if) #switchport Access VLAN 2SWA (config-if) # EndSwa#sh VLANSWA#WR (Save)18. Cisco and PC Connection methodFirst, the software cannot connect to the real device:Select a PC, one device (switch, router is OK)Connect PC and device, cable choose blue Cable, English shoul

Basic configuration: cisco switch configuration vlan (2)

-if) # channel-group 1 mode desirable Switch (config-if) # end Appendix: Switch (config-if) # channel-group port_channel_number mode {auto | desirable | on} // Add the physical port to an Ethernet channel and determine the PagP mode. 3) layer-2 Ethernet Channel Configuration Switch # configure termina

Cisco switch Port Mirroring configuration

(config) #no monitor session 1Switch (config) #endSwitch#wrSwitch#show MonitorNo SPAN configuration is present in the system.3. Other(1) Port image filtering, port mirroring can do filter.Monitor session session_number Filter VLAN Vlan-id [, |-]* * Specifies which VLANs belong to the traffic that the source port is entering, and can be emitted from the destination port.(2) Delete imageNo monitor session {Session_number | all | local | remote}**SESSIO

Cisco LAN switch maintenance and configuration

Cisco LAN switches are still commonly used. So I studied the maintenance and configuration problems of Cisco LAN switches. I would like to share them with you here, hoping to help you. Cisco LAN switches have evolved from a HUB-based LAN shared in the traditional sense to a broader space. Take Cisco's ipvst5000 series

Cisco MDS9000 Switch configuration, monitoring and troubleshooting (1)

Cisco Fabric Manager is a Web-based, easy-to-use, responsive application that can be used to manage switches and networks in an integrated manner, thus simplifying the storage lan san) management of Cisco MDS 9000 series switches. Cisco Fabric Manager provides network-level management functions for storage administrators, including identification, multi-

Cisco switch basic command + Win Server08 R2 multi-nic configuration link Aggregation

#config terminal Route (config) # line vty 0 4 ---- enter telnet remote login port mode (0 4 allows 5 Users) Route (config-line) # password CISCO ---- set the password to "CISCO" (to encrypt the password, enable vro password protection before: service pass-encryption) Route (config-line) # login ---- encrypted upon login Route(config-line)#exit Continue to enter the privileged mode and wh

Total Pages: 4 1 2 3 4 Go to: Go

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.