many of the existing AJAX implementations, such as Prototype,backbase and Ajax.NET, and combined with some of asp.net2.0 's unique features, invented such a absorbing AJAX framework. How nice it is to develop AJAX applications based on Atlas, it's hard to quantify, but at least not as good as the rest of these Ajax frameworks, and the impact of Microsoft's background, and the application of a heavyweight site like Live.com, is certainly worth looking forward to.
However, this is not to say tha
goal, the general product is manufactured through the acceptance of the project life cycle is completed. The product life cycle is different, including the pre-research, evaluation and feasibility studies before the project starts, and also includes the maintenance and abandonment of the products after the project is completed.Product Management and project managementThe goal of product management is product life cycle, and project management is the realization of project life cycle and project
scientific research institutions and enterprises of the development, practice, has been very perfect and complete. Standards have CMM, CMMI, ISO, 6SIGMA, etc. standards, so in the development of SQA activities, there are theoretical support, there are standards to follow.
In the reverse view of Internet product design, the theory we can use now seems to be only usability engineering and a small part of software engineering. And the standard part, al
these tend to be confusing for a long time, but it is someone who can quickly solve such problems. Can rely on a few people on the high-concurrency site
The new Web2.0 website, such as Flickr, can even include Google, in the early days are often a few people, these people do not have a reputation, but definitely a master. Can lead the development of a very good product
This can be thought of Unix and Linux authors and so on. Can host large-scale software design
This is often more commercially v
What Cmsis is, although the name is similar to CMMI, but it doesn't really matter.
To borrow the definition of Baidu Encyclopedia: ARM cortex™ Microcontroller Software Interface standards (CMSIS:CORTEX microcontroller software Interface standard) is cortex-m Vendor-independent hardware abstraction layer for the processor family.
In short, cmsis is a software interface standard defined by arm and many companies that produce CORTEX-M processors to enab
: 51Testing software test network%as7m7r0y e ' b\d;l P
TMM (test Capability Maturity): a set of evaluation systems similar to CMMI that can help us understand the maturity stage of the current test organization in international standards. "Z@*g*\3b! {R0
ISO9126: is an international quality standard that defines the content of many non-functional attributes. can help us to improve the design of non-functional properties of products, as well as the con
A lot of people talk about RUP or CMMI process improvement The first reaction is that there are many more documents in the process of the project, so many of the documents will not take up a lot of our time. This attitude to look at the document will affect the effectiveness of the process improvement, we are engaged in high-tech creative work, in order to meet the company's provisions and written documents with their own willing to write the content
Tags: label DBA NIS save double cursor move CMMI table name CreateMySQL Startup and shutdown commands:Startup: net start MySQL shutdown: net stop MySQLmysql command to change password:Use MySQL;Update user set Password=password (' 12345 ') where user= ' root '; command to log in:Mysql-u root-p New Login Usermysql> INSERT INTO Mysql.user (Host,user 2. Authorizing the user Authorization format: Grant permissions on database. * To User name @ login host
, the eyes of the masses are bright.
Improve the quality of personnel in each link from the perspective of needs. Brainstorm, do not throw the problem to QA, and reduce the burden on the brothers. Improve the combat capability of the entire team.
3. to shorten the time for a project, it is necessary to make rational use of resources. Resources in many enterprises cannot be reused, and the efficiency is low. You can start with some core resources, such as establishing a unified business platform
The full name of CCB is configuration control board, that is, configuration control board. CCB is a concept proposed in CMM (I). In some organizations, it may not be called the Decision-Making committee. There is a saying on the Internet that CCB is a change control board (Change Control Board)
The two statements are different, but the concepts and functions are the same. The description of the two in the CMMI-V1.2 is as follows:
Under: "configuration
: establish decision-making bodies and formulate code of conduct at the organizational level. Cmmiv1.2, the two PA have been "gone", the two PA content has been integrated into IPM (integrated project management) and OPD, OPD (organization process definition, organizational process definition) the SG2 (specific Goal 2) and SG3 (specific Goal 3) of IPM are marked with "For ippd (integrated product and process development )".
Whether cmmiv1.1 or v1.2, in fact,
Since the end of last year, the company began to implement cmmi3. I remember when I attended the training class, I listened to the instructor's introduction to process management, project management, engineering process, and support process, I was confused about the whole door. I never thought this ghost thing was so complicated and so troublesome.
The reason why the company wants to implement cmmi3 is to standardize the project development process, and to pull more outsourcing projects, because
the CMM/cmme requirements.
Dr. Ivar jacbson believes that improving from a poor software process will actually make software development worse, because you have solidified the software development process, it makes it more difficult to modify it later. The correct method is to first have a good software process, which is not easy, but worth doing. "It is very easy to make a good software process measurable, but it is difficult to turn a measurable software process into a good software proces
Implementation of cmme-Comments
In the MSN Project Management Group, a very senior IT staff member recommended her blog. I did a rough look at it. I want to read every article, of course, I also hope to improve myself through comments.What is the specific implementation of CMM/cmme?Address: http://blog.csai.cn/user2/50754/archives/2009/37460.html
The boss told us that we have to do the cmme too! My company has such a former full-time consulting consultant. After all, it has a unique advantage. I
call it development operations integration, but it may be too difficult to do this, we will talk about the development of operational integration.Visual Studio Online development platformVSO, formerly known as Tfspreview.com, is the online team Foundation Server (TFS) version, operated by Microsoft, to provide the cloud with development management capabilities. VSO mainly includes the following features:
Work Item Management: Work items represent a variety of requirements, tasks, tests
Question 3rd What are the current popular source program version management software and project management software, what are the pros and cons?Reference http://www.cnblogs.com/WJ1234/p/5285595.htmlHttp://www.360doc.com/content/12/0712/11/4565_223745448.shtml1. Advantages and disadvantages of Microsoft TFS:Advantages: It is the support of agile, Msf,cmmi and other projects, process management, process improvement. On the task page, you can take a gla
easy to understand and have a level for better commercial promotion. However, it is easy for enterprises to pass the level.
Continuous and step-by-step evaluation are also two different perspectives. With continuous evaluation, enterprises will obtain many levels of PA. with step-by-step evaluation, enterprises will obtain an overall level.
People who are not familiar with cmme can learn so much about it first, and then learn about it later.
CMMI
Recently, I just created a project as a project manager, a feature manager, or a product manager. It's all about that. I took a few people and a dozen people to complete a project, I have learned a lot. Of course, it is also annoying and tiring. Keep a record of what you want to do in the new year.
Do this project is in the IPD-CMMI process, take a project to learn the best is the first three axes:
(1) grasp the solution
(2) Plan
(3) Standards
Putti
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.