Links: http://poj.org/problem?id=1040TransportationTime limit:1000ms Memory limit:10000ktotal submissions:4235 accepted:1725DescriptionRuratania is just entering capitalism and are establishing new enterprising activities in many fields in-cluding transport . The transportation company Transruratania are starting a new express train from City A to city B with several stops in the Stations on the. The stations is successively numbered, city A station h
What I thought at the time of this question was that if the sum of the D value of a vertex is greater than the sum of the D + B value, we can. That's it. However, there is another way to solve the problem, which seems a little difficult. In the future, make up that practice.
Destroy Transportation System
Time Limit: 2000/1000 MS (Java/others) memory limit: 131072/131072 K (Java/Others)Total submission (s): 289 accepted submission (s): 181
Problem des
The Transportation Company calculates the freight for the user. the longer the distance, the lower the freight rate per kilometer. the basic freight per kilometer per ton is P = 3, the weight is W, the distance is S, the discount is d, the formula for calculating total freight F is f = p * w * S * (1-D ). The discount rules are as follows:S 250 500 1000 2000 3000 Please write a program to automatically calculate the total freight when the user informs
Excel solution to operational research-transportation problems
Original problem: a food company has three processing plants and each plant produces A1-7 T, A2-4 t, A3-9 T, respectively, ship these products to four sales regions and the daily sales volume is B1 -- 3 T, B2 -- 6 T, B3 -- 5 T, B4 -- 6 T, asking how to adjust the service, what is the minimum total freight when the sales volume in each sales area is met?
Solving
Topic Link:
Http://uva.onlinejudge.org/index.php?option=com_onlinejudgeItemid=8category=108page=show_ problemproblem=237
Topic Type: Backtracking method
Original title:
Ruratania is just entering capitalism and are establishing new enterprising activities in many fields including. The transportation company Transruratania are starting a new express train from City A to city B with several stops in the Stations on the way. The stations are successi
Ultraviolet A 1486-transportation
Question Link
A directed graph carries K goods, with some sides, each side having a coefficient A. If there is X goods on the side, you have to pay the money of a X, minimum transportation cost from 1 to n
Idea: The cost flow. The maximum capacity of this question side is only 5. Therefore, you can split the edge, one side into a C side, and each line has a capacity of 1, t
the two terminals of the route connectionRoute Length (>0). Pier A is numbered 1 and Pier B is M. The transportation cost per unit length is 1. The route is bidirectional. And NextA row is an integer d, followed by a row of D for each row is three integers P (1 The head from day A to day B can not load and unload goods (including tail). The same dock may not be available for multiple time periods. But at any time there is at least oneThe
lines is a description of the route, including three integers, which in turn represent the two port number of the route connection and the route length (>0). Pier A is numbered 1 and Pier B is M. The transportation cost per unit length is 1. The route is bidirectional. The next line is an integer d, followed by a line of D that is three integers P (1output Format:Includes an integer representing the minimum total cost. Total cost =n days the sum of t
SharePoint Code-free workflow design and development example--transportation reimbursement Process (iii)Category: SharePoint2012-07-21 01:28 8512 People read Comments (7) favorite reports SharePoint Work Traffic Task development tool 4, SharePoint Designer no code workflow designDevelopment tools for SharePoint Designer 2010Create a new list workflow, and bind the transport expense claim form librarySet workflow startup Options "Automatically star
Heavy Transportation
Time Limit: 3000MS
Memory Limit: 30000K
Total Submissions: 29682
Accepted: 7919
DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant stee L Crane to the place where it's needed on which all
Heavy Transportation
Time Limit: 3000MS
Memory Limit: 30000K
DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant stee L Crane to the place where it's needed on which all streets can carry the weight.Fortunate
Heavy Transportation
Time Limit: 3000MS
Memory Limit: 30000K
Total Submissions: 24398
Accepted: 6472
DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant stee L Crane to the place where it's needed on which all
Original title Link: http://poj.org/problem?id=1797Heavy Transportation
Time Limit: 3000MS
Memory Limit: 30000K
Total Submissions: 24576
Accepted: 6510
DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant stee L
Gold Transportation
Time Limit: 2000MS
Memory Limit: 65536K
Total Submissions: 2995
Accepted: 1065
DescriptionRecently, a number of gold mines has been discovered in zorroming state. To protect this treasure, we must transport this gold to the storehouses as quickly as possible. Suppose the zorroming state consists of N towns and there is M bidirectional roads among these towns. The gold
2000-ton number is special, which is exactly twice the transportation volume of trains and is just a complete number. The problem is: how far can 2000 tons of coal be consumed by 1000 tons at most? We know that 2000 tons of coal need to be set off twice by train, plus the return time in the middle, three times in total (no return is required after the last departure), that is, how far the 1000-ton coal train can run three times, 1000/3 meters.
Lik
. If the freight car cannot reach the destination, output-1.Example 1 input 1
??4 3 1 2 4 2 3 3 3 1 1 31 3 1 4 1 3
Sample output 1
3-13
Restrictions
1 s for each test point.Prompt
For 30% of data, 0 For 60% of data, 0 For 100% of data, 0 Source
Noip 2013 raise group Day 1
First, based on the nature of the maximum spanning tree, it can ensure that the transportation of goods on the maximum spanning tree is better than that on other sides.
Then t
Label: poj1797
Heavy Transportation
Time limit:3000 Ms
Memory limit:30000 K
Total submissions:21037
Accepted:5569
DescriptionBackground
Hugo heavy is happy. after the breakdown of the cargolifter project he can now expand business. but he needs a clever man who tells him whether there really is a way from the place his customer has build his giant steel crane to the place where it is needed on which all streets c
Transmission DoorHeavy Transportation
Time Limit: 3000MS
Memory Limit: 30000K
Total Submissions: 31882
Accepted: 8445
DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant steeL Crane to the place where it's need
HDU 3667 -- Transportation [maximum Tip Stream edge splitting classic], hdu3667 --
Transportation
Time Limit: 2000/1000 MS (Java/Others) Memory Limit: 32768/32768 K (Java/Others)Total Submission (s): 2441 Accepted Submission (s): 1041
Problem DescriptionThere are N cities, and M directed roads connecting them. now you want to transport K units of goods from city 1 to city N. there are still robbers on th
SharePoint Code-free workflow design and development example--Transportation reimbursement Process (ii)Category: SharePoint2012-07-21 00:55 7886 People read Comments (1) favorite reports SharePoint traffic work browser Tools String3, InfoPath Forms design and publishing(1) Data source and page designFields (elements) and fields (attributes) are as follows:White is a field (element) of that type, when published, promoted into a field, the data of t
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.