Based on his years of practical experience, the author systematically expounds the thought, method and matters needing attention of using Erwin for database modeling, which has some practical value.
ERWin Data Modeler is a database modeling tool of CA company, which is widely used in the design of relational database. The author after many years of practice, fee
ERWin 7.2 Download installation and Registration machineERWin 7.2:Ftp://ftp.ca.com/CAproducts/erwin/ServicePacks/AFEDM72-b1644.exeRegistration ID (999,999,999 user editions):User ID:SAMBLG (if need)Register ID:5W6DW-NUSHF-GGCP4-MH7MD-SXCBAErwin 7.2.5 allfusion Erwin Data Modeler R7 Registration code and ALLFUSION Model
Design | data | database | Database design
Erwin is used to establish the entity-relationship (E-R) model, which is an excellent case tool for relational database application development. Erwin can easily construct entities and contacts, express various constraint relationships between entities, and create corresponding stored procedures, packages, triggers, roles, etc. according to the template, and can al
Erwin is commonly used for database design tools, support a large number of databases, but not support MySQL, probably because few companies use MySQL bar, but MySQL is actually very good.
In order to be able to use Erwin to perform physical design based on MySQL database, the following methodological steps can be used:
(assuming you already have a well-designed logical MODEL)
1. Install MySQL ODBC DRIVE
From today on, database modeling can discard the powerdesigner and Erwin of dversion! Because trufun Kant 2007 for database has been fully capable of taking on the burden of database modeling!Whether you are E-R block diagram modeling, or generate DDL, or reverse engineering, or even want to generate Database Design reports, trufun Kant 2007 for database can be hand to catch, huh, take it ?!Your development tools can be simplified. You just need to ge
In Erwin, pre-script and post-script can be customized. When will these custom scripts be triggered?
In addition to ensuring that the pre-and post-script option is selected in the right-click table option, the table-level script is triggered only when you create or discard a table, if only a field of the table is modified, the script will not be triggered.
-A small obstacle to self-generated DDL modification encountered during Data Model Modific
.
================================== ====================================To cancel the preceding operations:/* Cancel binding a rule on a custom type */Exec sp_unbindrule intswitch/* Delete a Rule */Drop rule list/* Ensure that no field uses a custom type before deleting the custom type, you can go to "user-defined type" in Enterprise Manager to check which fields are using this custom type *//* Set the on_or_off field type to another type in the design view of the table mytest, such as the int
based on the business goals that ensure that the business meets the defined goals.
Analysts must record all important aspects of the process:
What is a process flow?
What resources are used in the process?
What are the business items operated by the process?
What organizations and locations are involved?
When analysts study the process and collect data, they will record the following:
Activity Input and Output
Task changes and time of occurrence
Alternative task
Complete task descrip
1. about connecting to the Oracle database
①, Normally connected to generate the database
Of course, you must connect to Oracle before creating a database.
1. First select the DataBase type: DataBase ---> Choose DataBase:
2. Establish a connection:
DataBase --> DataBaseConnection:
At the beginning, I had no idea what to fill in for the Connection. In fact, enter your Oracle service name:
VARDENOR =(DESCRIPTION =(ADDRESS =(PROTOCOL = TCP)(HOST = VARDEN)(PORT = 1521))(CONNECT_DATA =(SERVER = ded
database modeling using Erwin and Erstudio (by quqi99)
Author: Zhang Hua published in: 2007-10-25 (http://blog.csdn.net/quqi99)Copyright NOTICE: You can reprint, reprint, please be sure to hyperlink form to indicate the original source and author information and this copyright notice.
There are two views of logical view and physical view in Erwin.
First of all, modeling in logical view, in the left tree
(I recently learned Erwin and found this good article for literacy)
1. If you only create a document, you can choose to create only the logical view2. For a project, you must use both the logical view and physical view.3. Generally, logical view is used for document creation, while physical view is used to generate or export scripts.4. Three connection lines between tables. The first is used to insert the primary key in table 1 to the foreign key in t
650) this.width=650; "alt=" SPSS Modeler "class=" Img-thumbnail "src=" http://evgetimg.oss-cn-hangzhou.aliyuncs.com/ Content/files/2016/5/27/86810c3ea04e4b3d90bf1d141922335c635999390909143561.jpg "/>Background IntroductionMany users will pay attention to a problem, that is, after the model is created, how to automate the operation of the model, because it is not possible to run each time to open the SPSS Modeler
Understanding IBM SPSS Modeler and database integration and optimization
In the first part of the three-part series on IBM SPSS Modeler and Database Integration modeling and optimization, we talked about using database nodes to write and read data to a database. Next, we'll introduce the use of SPSS Modeler applications to build, score, and store models in a dat
IBM SPSS Modeler and Database Integration modeling and optimization
In the first two parts of this three-part series on IBM SPSS Modeler and Database Integration modeling and optimization, we talked about basic operations and integration modeling related to databases, and this section focuses on performance optimization in the process of using the database for SPSS Mod
If you do not know or have never heard of AIM (Autodesk Infrastructure Modeler), you are a bit out. AIM is a powerful conceptual design tool launched by Autodesk, regardless of customer needs or from Autodesk, the investment is very high. If you don't know much about it, you 'd better take a look at it now. Just put a few at will:
Update:
Autodesk Infrastructure Modeler 2014 has been renamed to Autodesk Inf
Power load forecasting is one of the important tasks in the management of power system dispatching, electricity, plan and planning. To improve the level of load forecasting is beneficial to plan power management, to rationally arrange power system operation mode and unit overhaul plan, to benefit coal, fuel economy and reduce generation cost, to make reasonable power grid construction plan, and to improve economic and social benefits of power systems. Therefore, the load forecasting has become o
Let's talk about it. Integrated Activiti Web Modeler, when you complete the Web integration, it is recommended that you look at this person to write the blog, summed up, learning things or to understand the principle, more look at the source code, a lot of useful and learning places.
When you finish reading the following, recommend this person's blog, Better deep connection source: Click to open the link
1.web Mod
Brief introduction
IBM SPSS Modeler Entity Analytics (EA) is a new feature added to IBM's SPSS Modeler 15.0 based on the IBM SPSS Modeler 14.2 Predictive analysis. Compared with traditional Modeler, Entity Analytics has a new dimension for data prediction. IBM's SPSS Modeler
IntroductionThe evaluation of several modeling tools was highlighted in the previous blog, and SQL Power architect was selected as the final modeling tool, and the Oracle Data Modeler support Vertica was also studied during the evaluation process, although the eventual abandonment of Oracle data Modeler, but the scalability of Oracle Data Modeler is worth bloggin
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.