according to the plan, click Next22. In the set root password, according to the plan enter the system root password, click Next23. In the Select installation type, select Use all space, and select the need to modify the partition, click Next24. Select the disk to which the system will be installed, click Next25. Partition the disk according to the planning data and click Next when you are done26. Select Write to Disk27. Set the system boot disk to/DEV/SDA, here is the default setting, do not ne
"Upgrade Step"
1. Motherboard BIOS to upgrade each blade first (current version I15 2009.07.10)
Reboot server required to complete upgrade
Upgrade method: Under Windows Double-click the downloaded EXE can.
Download Link:
Online ROM Flash Component for Linux (ESX)-HP ProLiant bl460c (I15) Servers
Online ROM Flash Component for windows-hp ProLiant bl460c (I15
board that connects blade servers to network and shared storage devices at once. Power is provided through a converged supply backplane, providing flexible power input options: single-phase AC input, three-phase ac input, -48v dc input, and high voltage dc input.
HP BladeSystem c7000 cabinets are more than just blad
Configuration: c7000
Chassis (standard, 2
Power Supply Module, 4
Fan (s,
Front View:
Rear view
:
Four Power Supply Modules
Six fans
Bl460
Ten (half-height blade servers,
Bl680
(Full-height blade servers) three,
2
Items
Gbe2c 1000 m
Ethernet switch,
1
Items
HP brocade 4/12 SAN Switch
.
Install iSCSI target serverCreate a iSCSI IMG file by dd cmdPublish the target
Install TFTP Server
Install gpxeDownload the gpxe packageMake the undionly. kpxe and CP to/tftpboot/gpxe
Install DHCP serverAdd options to DHCP serverIn the subnet section, add host section for every blade server
Attach the usb dvd to c7000 OA and connect it to one blade se
case, all uplink ports are members of lacp, and must be enabled in the Peer switch port.
Second, we also need to create two fcoe-san named fcoe_a and fcoe_ B to provide high-reliability San access functions.
Finally, we create a server profile for the host assigned to us, and allocate 6 flexnics and 2 flexhbas. The network usage functions are as follows: management Network, San network, vmotion network, and production VM access network. To improve high reliability, we create a group for eac
Tags: HP c7000 VC flexfabric vsphere fcoe ladp vsphere bl460g8
Overview: HP c7000 VC flexfabric SUS is configured as active/active, lacp, fcoe, vsphere
First, create two sus named VLAN-Trunk-1 and VLAN-Trunk-2, respectively. VLAN-Trunk-1 has 2 uplink ports (Bay1-VC X5, X6), VLAN-Trunk-2 has 2 uplink ports (Bay2-VC X5,
.
650) This. width = 650; "style =" border-bottom: 0px; border-left: 0px; border-top: 0px; border-Right: 0px; "Title =" 4 "border =" 0 "alt =" 4 "src =" http://img1.51cto.com/attachment/201410/12/718756_1413082541MrK0.jpg "Height =" 295 "/>
Now the configuration is complete:
If the bay1 host is installed with the OS, you can view the network connection at the OS level;
If there is no system, you can set the hba bios at boot, configure boot from San, and install the OS in the remote
/wKiom1WkzRHTdKBBAACkvt7jZ6Y269.jpg "style=" float: none; "title=" 1.png "alt=" Wkiom1wkzrhtdkbbaackvt7jz6y269.jpg "/>5 . to boot the system to Lost Password (lost Password) modem, please press L . The password is displayed when the system reboots. ()650) this.width=650; "src=" http://s3.51cto.com/wyfs02/M01/6F/AC/wKioL1WkzuqAOgMBAAHz5h9HMFs757.jpg "style=" float: none; "title=" 2.png "alt=" Wkiol1wkzuqaogmbaahz5h9hmfs757.jpg "/>This article is from the "Qin HSBC Technical Notes" blog, please b
Chassis: C7000
Note: There is no DVD drive on the C7000, but there is a converter connected to the front panel of the blade server, and two USB ports and two Display Interfaces are transferred out. The external USB drive method is not tested by the HP official team. We recommend that you use the ILO Remote Installation
NICs. By default, each Nic can initialize and configure an IP address. In addition, to prevent Nic faults, we will create two Nic teams in this chapter, nic1 and nic2 to form a team1 (vlan101 allowed), nic3 and nic4 to form a Team2 (allow VLAN102-105; VLAN2100-2150 traffic data through ). This configuration, coupled with the dual-Active configuration of VC, enables high availability for VC module and nic faults and link faults at the same time to prevent data communication interruptions caused
Recently found on HP Blades deployed on the virtual machine, after the blade restart (abnormal power loss caused) virtual Machine network communication failure, the performance is as follows:
Communication between the same blade virtual machine network is normal;
Communication anomalies between different blade
Original article linkSteps for installing an HP Blade Server:The HP blade uses a management platform named OA (onboard administrator) for unified management, which is highly integrated and easy to use. You can enter an IP address in the IE browser for management.Installation steps:1. Determine the IP address of the OA2
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.