Atitit Project Management (5)---------- Logistics Management and tool chain support management1.1. keyword11.2. 1 additional software 1.3. Management of public modules (2 )1.4. Third- Party Class libraries table 21.5. Project
From the initial selection of Practical Training Questions to contact the teacher to understand the needs of the questions, and then our team analyzed the functions that this project should have, and finally the division of work to everyone. So far, I have learned a lot in this process for three weeks, and I have only been able to practice it, you will be able to learn the mysteries of the solution.
Recently, many documents have been written. Whether
1, QQ Management System class diagram is as follows:(1) Reader class is the borrower's class, its properties are many, including the borrower's account ID (reader_id), name (Reader_name), Address, Class (class), books borrowed from the bibliography (borrowed) and so on. The main operations are borrowing books (addborrowed) and book return (deleteborrowed) and booking (reservation) and so on.(2) Admin class
Issue background:
Now, in the company, like a professional handyman, from a number of projects in the middle of the journey, in different problems shuttle. I began to nostalgia, study, a few daily papers, experience a little bit of the day, maybe that day to me more full.When faced with every day of the interface ·, the time is constantly scattered, and then scattered.
the condition of the study:
At that time, study more silly, really he thought he would do something, read pape
, calendars, tables, to complex Tag Cloud, cover flow, maps, wyswyg format toolbar, and so on, with these do not need to draw from the beginning, often faster than the use of whiteboards;
The modification of interface elements is very simple. For example, the labels of several tabs in the navigation bar are text separated by commas, and the option in the drop-down box is the text of the Branch;
Use XML to record and save interface elements and la S,
This allows every design to be
Project and software recommendation editor-qownnotes
Today recommend a software qownnotes, is a general text note software. With a path as a directory, ROM lists all MD files or txt files under the directory.
There are the following highlights:
Fast boot speed (using the SQLite database to speed file reads).
There a
IOS-knowledge architecture management, project management, thinking management (brainstorming) Mindjet-MindManager, mindjetmindmanager
Mind Map is an excellent tool for thinking about how to quickly improve work, study, and life efficiency, whether it is goal setting, project
Label:Before writing an IntelliJ idea 13 trial note, Idea also has a lot of big on the function, ease of use almost comparable with vs.net, anyway, I have since switched to idea, never opened Eclipse, today to see a few advanced features: I. Integration with JIRA Jira is a widely used project and transaction tracking tool that is used extensively in the areas of defect tracking, customer service, demand collection, process approval, task tracking,
Edo releases the latest web Gantt chart!
Three new views are added: Tracking Gantt charts, calendar views, and network diagrams.
Key tasks and Key Path Display are added.
The four views are as follows:
1. Gantt Chart
2. Tracking Gantt charts
3. Calendar View
4. Network Diagram
Yidu Gantt chart is the leading Gantt Chart solution in Web development.
It is developed using JavaScript and implements the same
I. Build an Android App project1. Running Eclipse.exe2. See3. Enter the interface4. Enter the app, project, package name5. Select the workspace path that the project establishes;6. Configure features such as icons and backgrounds7. Select the Activity's page format8. Set the corresponding name9. Build the ProjectTwo. Project Introduction1. The interface can use t
manage my team. But you really need to use the most famous CMM in your team. Even more frustrating things are coming soon.Surface: in CMM, the light is a pile of nouns and documents, which can be understood for a long time. Moreover, these standards and guidelines are more like scoring manuals and are not operable. The project team seems to be busy all day and always have a meeting.Annoying, but the real software
The purpose of this document is to make it easier to use Git.What you can do after reading this document is:1, simple to manage the project with Git.2, how to develop and also deal with the release of the version of the bug situation.Sourcetree is a free git graphical management tool that can be installed under Mac.: https://www.sourcetreeapp.com/Reference:Http://www.liaoxuefeng.com/wiki/0013739516305929606
software requirements and reach an agreement. It is also the basis for the implementation of development work. This manual should provide data logic and data collection requirements to prepare for the production and maintenance of system data files.
Design Phase
4. Summary Design Specification
This manual is the work result of the actual phase, it shall describe the function allocation, module division, overall program structure, input and output, in
the train, the driver only operates the train, the actual internal or by the train braking system to force the train to stop; people close the door instead of people, imagine if the door does not have a rotating shaft you can not shut it, or the process of the encounter obstacles you can not shut it.
3. Class Diagram
Drawing is very helpful in understanding and analyzing problems, do you have a better way to do it than paint?
This system mainly use
Configuration
Management refers to the discipline used to control a series of changes in the system.
A series of technologies, methods, and means have been used to maintain the product history, identify and locate the unique version of the product, and
Control Changes in the Development and release phases, and ensure the quality and efficiency of production by managing and reducing repetitive work in an orderly manner.
Unlike configuration
The purpose of this document is to make it easier to use Git. What you can do after reading this document is: 1, simple to manage the project with Git. 2, how to develop and also deal with the release of the version of the bug situation. Sourcetree is a free git graphical management tool that can be installed under Mac. : https://www.sourcetreeapp.com/ Reference: Http://www.liaoxuefeng.com/wiki/001373951630
service to complete a project or part of a project)⑵tool without back (look)Information presentation tools (software packages for reports, spreadsheet analysis, presentations, or illustrations)Performance information collection and editingStatus Review Meeting⑶OutputPerformance report (budget, earned value, actual cost, cost variance, schedule deviation, perform
features: 1. temporary 2. uniqueness 3. one-time, we will tell you which of the following is a project: a Hewlett-Packard and Compaq are restructured, and HP and Compaq are restructured. B. Build a new factory. C. Build a road. D. engineering materials. Purchase e. Development Software Package. f. Wedding Ceremony. G. Look for bin Laden. Some people say they are looking for bin Laden. Do you have a clear e
. Development Software Package F. Wedding Ceremony G. Search for bin Laden
Some people say they are looking for bin Laden. Do they say there is a clear end time for finding Bin Laden?Of course, we can assume that if we cannot find bin Laden for 50 years, the project will end, right?
So today we will not discuss which project it is, and all the problems should be
Cost management is one of the main contents of software project management. It analyzes the problems existing in the current software development cost management process, and puts forward to consider linking progress with cost, th
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.