Alibabacloud.com offers a wide variety of articles about project resource leveling, easily find your project resource leveling information here online.
After you establish the good one MAVEN project, if there is no Src/main/java folder under the Java Resources Resource file, and you manually create the file, you are prompted for "existing file." This indicates that the Src/main/java folder is already available in this project configuration.Workaround:Right-select Properties on the
Android--android Lint Tool Project resource cleanup
Recently maintained projects for more than two years, through the iterations of many predecessors, the project has not become robust, and become very bloated. The Android Lint tool cleans it up once, clearing out a lot of discarded layouts and resources.
1. Android Lint Tools
Can right key item, Android tools
The software is released in multiple languages and can be edited in different RC files in different languages. Create a new compilation item as needed and bind the compilation item to the specified RC file for compilation. Multiple RC files share the same resource. h header file to facilitate resource management.
Example: Use vc6 to create a multirc project an
In Eclipse, you import a project using Maven, but when you perform a f3/f4/ctrl+alt+h operation on a class, you get an error: "The resource is not on thebuild path Of a Java project ". This often happens when you reopen eclipse.Cause: The class could not be found in the build path of the project.Workaround:1. Locate the file under BuildPath below SRC and remove i
Reasons for why no resource found that matches the given name ' Theme.AppCompat.Light 'This blog has been written very clearly, we can refer to http://www.jianshu.com/p/6ad7864e005eThere are some problems in resolving the exception here to add1.Eclipse SDK Manager does not have an Android support library The solution offered on the web is to replace the image source to solve, but now Baidu can find the image is not included in the item.can be download
Link: http://blog.csdn.net/wuxianglong/article/details/6335683
In many cases, we need to access the resource files in Android. These resource files are mainly divided into two types, these files are not compressed when they are packaged into APK files; the other is files under res. When these files are packaged into APK files, small memory optimization will be performed.
I,Asset File Access
Andr
Turn from: Click to open link
Assuming that the resource file is placed under the Src/main/resources Resource folder of the MAVEN project, the source file is placed under src/main/java/, then the Java folder and the resources folder are classpath real locations at runtime, if
There is a file located in Src/main/resources/test.txt
There is a class in Src/main
Cause Analysis:This situation is caused by version inconsistency, this invalid directory is not the current compile time generated, it is possible to debug the case, generated.Since the 1.6 version was previously only drawable a picture resource directory. SoWorkaround One:Modify the project version to more than 1.6.Workaround Two:Delete the error crunch folder directly in the project.Then run, fix it ~Refe
Problem: "Unable to find the report in the manifest resources. Please build the project, and try again"
Cause:
1. Set the Build Action attribute of the report file to "Embedded Resource" ("Embedded Resource ").
2. the namespace of the report class file is inconsistent with the rpt folder of the report file. You can draw a conclusion through a small test to cre
The following tool classes are used to implement user resource and project separation:Save Path Tool class Packagecn.gukeer.common.utils;ImportCom.github.pagehelper.StringUtil;ImportOrg.apache.commons.logging.Log;Importorg.apache.commons.logging.LogFactory;ImportOrg.springframework.core.io.ClassPathResource;ImportOrg.springframework.web.multipart.MultipartFile;ImportJava.io.*;Importjava.util.Properties;Impo
resource handling, giving two classic solutions.Method One: Adopt After configuring General Web application Server The default servlet name is "default", so Defaultservlethttprequesthandler can find it. If your default servlet name for all Web application servers is not "default", you need to display the specified through the Default-servlet-name property:Static resources in this way are best placed in the WebApp directory, which is the Web-inf si
Well, has been using MyEclipse, and later with Eclipse, after starting the project to the Tomcat WebApps find the corresponding folder, found that no, only to know that eclipse default does not go to the local Tomcat deployment.1.eclipse Unlike MyEclipse, the project is deployed to WebApps in the Tomcat installation directory by default and is deployed to the working directory by default. metadata.plugins\o
01, download the JDK, install the JDK, installation needs to cancel the source code.Configuring Environment variables = D:/jdk/binCreate a new environment variable: Java_hemo = Path D:/JDK02. Download Apache TomcatDouble-click Open: Apache-tomcat-9.0.1\bin\shutdown.bat (must be opened to run when debugging)Change: Apache-tomcat-9.0.1\conf\server.xmlFind the end of the Host tag by adding the following label e:\\html = Project file Paramete
introduced by the way IMG is processed9.3: The reference picture in the component (if you want to use a relative path requires ${require ('. /img/aa.png ')})10. Install Url-loader, similar to file loader but he can specify a limit parameter, when your file and picture is larger than your specified limit, it will be executed to file loader, when your file is less than limit It will automatically be converted into a base64 encoding.11.image-webpack-loader Compress pictures, but must be used in co
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.