Team plan (4.20), team plan 4.20
Completion: Understand the as interface and basic functions
Develop basic personal module plan
And link: Run helloworld: http://jingyan.baidu.com/album/90895e0fce970264ec6b0bf2.html? Picindex = 5
As introduction to knowledge: http://blog.csdn.net/yanbober/article/details/45306483
Plan Overview:
Premise: I am responsible for budget management. The specific function to
Team Name: Invincible c++++Huang Platinum 2015035107095 Score 10 points seriously responsible, with the teacher actively communicate, attitude seriouslyDeng Qing 2015035107020 Score 9 points responsible for writing foreground code, actively participate in the meetingBai Dongming 2015035107012 score 8 points code writing, very good to complete their own responsible partsZhang Xiaonan 2015035107021 score 7 points a lot of optimizations for the programZh
When it comes to implementation, it feels heavy, and I don't know where to start. To execute it is not only a rich knowledge, but also a set of very specific acts and art, in the individual, in the collective, in the enterprise, in the country, no matter how great the ideal you have, and no matter how advanced you have the management concept, if not to struggle, not to execute, ultimately can only be affixed to the wall, It's just narcissistic. As an IT team
consists of n positive integer ci, where CI denotes the color of the sock, and the same color is represented by the same number. The next m line, two positive integer l for each line, R indicates a query.Output format:Contains m rows, for each query the output fraction of a line is a/b indicating the probability of randomly extracting two socks of the same color from the range [l,r] of the query. If the probability is 0 then output 0/1, otherwise the output of A/b must be the simplest fraction.
Axure + SVN-multi-person team development and axuresvn team development
The examination system has been restructured recently. A group of more than a dozen people need to draw prototypes at the same time. In this way, the original cooperative development tool SVN can no longer meet the current needs. This is a new method-Axure + SVN.
Create an empty configuration library on the SVN server named 123. The ope
Recently, I was quite depressed when I encountered a very bloody thing. A UnionPay card payment project developed by my hand has some problems in the system O M phase. Although it was finally solved, the emergence of reflection on the problem and the deep-seated reasons have deep feelings for the skills of project management and the establishment of team rules. The major issues that have emerged include:
1. The bank card overseas transaction failed.
mode and death mode, the normal mode is simple from the beginning to the end, death mode on the road to set the level has health value.3 double-mode dual-person puzzle and two-person athletics, puzzle is the level set puzzle questions correct clearance, wrong to continue to answer questions, athletics is a person's starting point is another person's end, and another person's end is a person's starting point, compare who first to reach the end.Five Operating EnvironmentInitially developed for PC
5W2H Law, I believe many people have seen, but how to use it.
When (scheduling, limited tasks using the reverse method)
WHERE (Research and Development Center, for us there is no need to discuss)
Who is responsible for doing this, one person or many people
WHY (It is generally clear what is the purpose of your own doing this thing)
How (To do this thing, what is the plan)
We should pay attention to the team
Split task granularity of
Check
half a day, they also get up and go into the water: I don't believe that undergraduates can pass the water, but my doctoral students cannot. Just listen to Doon, doctoral students planted in the water.The two directors pulled him out and asked him why he was launching the project."Why can you go over? "The doctoral student did not answer the question.The two directors smiled and said, "There are two lines of wooden piles in the pond, because the rain in these two days is just under the water. W
After learning for a week, my work has been coming out slowly. After lab meeting, I started to read the discussion, however, the Professor hasn't asked us to share any projects with him for the rest of our lives. We probably don't know much about them, so we still can't do anything, let's talk about it first.
Is it really better for a big team? I don't know either, but at least one of them is quite special, that is, there are a lot of renewals that c
This afternoon we discussed the task of the notes we made:1. As a note, you must first have the necessary recording function2. With the record will have the corresponding paste, copy, cut3. Also design to save notes4. Login function is also set for the security of notes5. In order to facilitate the sharing of notes need to generate two-dimensional code text6. Because of the user's information is also related to the writing of the database7. Where the notes are saved is in the file of the specifi
Focus on the "lab building" and share a project tutorial every day
Each web developer enters the development team early in his or her career. How to make yourself work more efficiently and be the person the other team members want to collaborate with. Here are 7 skills you need to master, and believe that the following content is also helpful to you who are looking for a job.
Text total: 2340 words
Estimate
Introduced:
For the Agile development team, team management is also essential, I led the team divided into 2 parts, one is the development team, one is the Test team. Development team, I am generally more comfortable, because aft
Use IBM Rational Team concert to build a GWT Application sample and troubleshoot program failures (Debug)
Introduction: Ibm®rational®team Concert is a real-time, collaborative software delivery environment that enables the team team to simplify, automate, and oversee the management of their software delivery processes
Date: 2016-7-25
Content:
Respect for the original: This article reprinted to: Http://www.cnblogs.com/haore147/p/4219673.html
2015-01-12 20:32 by Hui, 3692 reads, 0 comments, favorites, edits 4.3. Organization and Team
GitHub did not specifically provide an account for the organization in the early days, and many enterprise users or large open source organizations had to use ordinary user accounts as shared accounts for the organization. Later, Gi
Project | project "It Nations" "Chicho"--discussion on the role of General project team members in project
0. Preface
Chicho is a description of small characters, the story of the little people, it said Qi taste June two unknown Menke through the rooster and dog thieves such tricks help Meng June from the Strong Qin from the hands of the experience of escape. Meng June Tianwen is one of the famous four Gentlemen of the Warring States, hospitable,
Where incentives are needed, for ordinary employees, he may not consider the long-term development of the company, it is difficult to identify with the company's longer-term interests, and the company together. This is also easy to understand, we are generally very young, strong personality, do not think too much about the consequences, like new things, no family pressure and so on, so their decisions are often more casual. I have experienced colleagues leaving, including my own several times to
We always wonder how the big international designers are working, do they change all night and work overtime on weekends? How do they like to sort the PSD? How does the team work together? How to inspire creativity to come up with such a novel and interesting idea? We need answers hidden in the lines of these interviews.
Pinterest is such a company that will often arouse our curiosity. What is the experience of working in this company with Twitter su
How to build and build a good development team, these developments are personal views, if there is bias, hope to communicate with each other.
1. To achieve the basic premise of forming a development team.
A: The premise of starting a small or large-scale development team is the project prototype and funding in place.
B: Any investor, entrepreneur has a subconsci
Some of the outstanding team and personal blog about ued, some sites worth collecting.
Front End TeamAlibaba UED-The interface we designed has no billions of traffic, but millions of businessmen from hundreds of countries are using it every day.Alibaba China Station UED-Alibaba China Station Ued was founded in 1999, the full name of the user Experience Design department (users experience designed Department), Alibaba Group is one of the most senior de
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.