Teamwork #3, week5, scrum meeting 11.4

Label: style SP data on code BS ad working time Today, we held the first scrum meeting, summarized the work achievements and lessons learned in the recent period, and assigned each member the next step. Web Crawler is a difficult problem for us, because we have less contact with each other before, so we need to start from scratch. We have referred to a large number of similar projects, learned a lot of pr

Scrum stand-up meeting

Stand -up meetings are the members of each other who stand up to each other and say their progress, not meetings, not writing reports. is for better communication and coordination, essentially for engineering team communication.The requirements for the scrum stand -up meeting are as follows:1. Members are equal, and statements do not differ between managers and programmers, and everyone needs to keep their

Twelfth scrum meeting 2015/11/9

The first phase of the development is coming to an end, the project code has been assembled, planned to release the results of the first phase on November 10, 2015, the meeting mainly to discuss the next stage of work to be completed and page modification, as well as testers of the bug collation. Meeting minutes: First item: Interface modification1. Main Page: Back button removed, title bar page height

First scrum MEETING

Labels: style blog HTTP color SP strong data on 2014 In this meeting, we determined the specific assignment of tasks. In this part, each person has a programming task of about 20 hours, and the entire project has a total of about 140 hours. Tomorrow is the first day of the formal start of software implementation. The following lists the tasks of each person in the previous two days: Day 1 Day 2 Ding Xin

Scrum stand-up meeting

Stand-up meetings are the members of each other who stand up to each other and say their progress, not meetings, not writing reports. is for better communication and coordination, essentially for engineering team communication. The requirements for the scrum stand-up meeting are as follows:1. Members are equal, and statements do not differ between managers and programmers, and everyone needs to keep their s

Scrum Meeting 7

Seventh Meeting NO_00: Working ConditionNo_01: Task Description Pending completion is complete NO_10: Burndown ChartNo_11: Photo RecordingPending updateNO_100: Code/document check-in recordNO_101: Attendance Form Name Status of attendance Chi Qiang √ Du Zhengyuan √ Huang Shang √ Hanwen √ Zengjie √

Scrum ceremony Sprint planning meeting

meeting time:4.12. Eight o'clock in the eveningVenue: Second School buildingConference Process• First we discussed the experimental first Sprint1 to achieve the function of our initial goal.• We then combed through the tasks and requirements of the first phase.• The tasks are then divided and picked up.• In the end, each person estimates his or her task and makes an appointment for the time and place of the next meeting.team's BacklogInitial total goa

Scrum ceremony Sprint planning meeting

· meeting time:4.12 Three o'clock in the afternoonConference Venue: Basic Teaching BuildingConference Process• First we discussed the first Sprint1 of the experiment to achieve the function of our initial goal.• Then further combed through the tasks and requirements of the first phase.• The task is then divided and picked up.• Finally, each person estimates his or her task and determines the time and place of the next meeting.team's BacklogInitial tot

"Alpha" eighth scrum meeting

experiencing multiple tribulations, Huang Yumeng completed 1091 of data processing.Issue Link: https://github.com/buaase/Phylab-Web/issues/54 3 Hanwen Mr. Hao today is responsible for processing 1082 of the data, but he went to the waves today, to the meeting did not finish!!! 0!! Harrison He Songo completed 1061 of the experimental data today.Issue Link: https://github.com/buaase/Phylab-Web/issues/47

"Alpha" fifth scrum meeting

processing 1 Harrison He Songo today to preview all the high-definition pictures in the report out, the effect is good, time is quite long.Issue Link: https://github.com/buaase/Phylab-Web/issues/51 5 Issn Uncle Xiao Today modified the structure of the database, the current Web page prototype is also to be changed. Then a subset of the user collection logic is completed.Issue Link: https://github.com/buaase/Phylab-Web/issues/43 2 Toda

Fifth Scrum Meeting-2015/10/30

design, compose a blog Write a blog to urge other students to complete the task Kinya Ren Design logo Design logo Yan Developed a two-level list of video catalogs Develop a course profile module to interact with the server Yu Fan User picture in the interface for developing user information Other modules in the interface for developing user information Shi Xuan Adjust the display of video playback fu

Sixth Scrum Meeting-2015/10/31

members to use Git skillfully is the fundamental solution to this problem.Mission ProgressThe progress of our mandate today is as follows: Group members The work done today Tomorrow's mission. Bin Tang Interacting with the server Optimize the Display of tab pages Yorihiko Oracle Write a blog to urge other students to complete the task Write a blog to urge other students to complete the task Kinya Ren Desi

2-twentieth Scrum Meeting-20151220

Task Schedule Members Completed today Tomorrow mission Yan Leave (database) Bin Tang Leave (database) Shi Xuan Try to update notification with Downloadmanager Try to update notification with Downloadmanager Yu Fan Path Save Path Save Kinya Ren UI Modifications UI Modifications Yi Sidogi Learn developed code Learn

Notes of Daily Scrum meeting (12.17)

We will try to arrange the time to speed up the progress of the project in the event that other assignments are not affected, and to complete the beta phase before deadline.Today's team summary is as follows: Team members Team work today Chen Shaojie Debugging Network Connections, supplementing back-end code Di Test and debug The search method Jinxin The design of the icon and the setting of the position of the optional

Notes of Daily Scrum meeting (12.19)

Today the pace of work progress not slightly improved yesterday, I hope you make unremitting efforts! Come on!The team tasks are summarized as follows: Team members Team work today Chen Shaojie Retry the debugging of network connections using get and other methods Di Problems detected in the Debug search function Jinxin Testing a bug in the UI interface that has been written out Lei Yuanyong Modify the

Notes of Daily Scrum Meeting (12.20)

Today is Saturday, everyone spare time is quite a lot of, also took the initiative to complete the day work, finally due to my mistake, at night 12 o'clockBefore the progress was checked into TFS, so the Saturday burndown chart is wrong, I put progress into Sunday, the overall progress will be in the Sunday BurndownPicture inside.Here is a summary of today's tasks: Team members Team work today Chen Shaojie To continue the debugging of the network connection

Notes of Daily Scrum meeting (12.21)

Today's Burndown chart to add in Saturday progress, because my mistake did not update TFS in time, so there are some errors, to apologize to everyone.Here is a summary of today's tasks: Team members Team work today Chen Shaojie To continue the debugging of the network connection Di Test search function, optimization algorithm Jinxin Beautify the interface and test the UI Lei Yuanyong Test the search fu

Thirteenth Scrum Meeting 2015/11/11

Post a bug grooming rally: Optimized optimization of mobile User experience:(1) The font specifications and interface structure of the main interface and course interface are different (2) The size of the course picture format is not uniform, resulting in a beautiful decline (3) The position of the button is not beautifulTablet user experience:(1) Tab key on the tablet, basically particularly bad press, you need to be careful to press, or you will press the course below(2) The sliding displ

Notes of Daily Scrum meeting (12.25)

Today, with the help of elder sister, we finally connected the Internet connection, which is a great encouragement to us, also found the earlyThe problem is not connected, which gives us the courage and determination to carry on, we will combine the front end and the back end in the last few days,To make our final project results.Today's Team Task summary: Team members Team work today Chen Shaojie Processing the acquired JSON data after connecting to the net

"Alpha" seventh scrum meeting

Today's mission list: Name Complete the Mission today The time elapsed between Liu Hu There's not much to do today ... Looking at the formatted output of Python 2 Lu Yu Generate a Physical Report experiment pageIssue Link: https://github.com/buaase/Phylab-Web/issues/27 4 Yan Ting Rough version of the personal registration page login, you can make certain judgments 2 Huang Yumeng

Total Pages: 4 1 2 3 4 Go to: Go

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.