Label:None of the previous versions of Oracle 12c are self-contained, and if you need to use a self-add column, you need to sequence.
DROP TABLE CustomerOrder PURGE;CREATE TABLE CustomerOrder(ORDERID number is not NULL,PRODUCTID number,PRODUCTNAME VARCHAR2 (50),CONSTRAINTS Pk_orderid PRIMARY KEY (ORDERID));DROP SEQUENCE Sq_orderid;CREATE SEQUENCE
First, the problem analysisIn the case of violent resolution, the total number of cases considering the sub-paragraph is 1+2+...+n=o (n^2). Considering the dynamic programming algorithm, the complexity of O (n) algorithm can be realized.Second, the program designIii. Results of the procedureIf the sequence is full of negative numbers, it is actually choosing the maximum valueGiven a sequence of n integers a
value, if the concurrent access is too large, but the size of the cache will produce sequence Cache related wait, affect the system performance, simply say is caching.
Using the cache may also be skipped, such as the database suddenly abnormal shut down,cache in the sequence will be lost, you can create the sequence again with NoCache to avoid.
SGA: The
Example 1: Creating a sequence: CREATE SEQUENCE ABC INCREMENT by 1 START with ten MAXVALUE 9999999 nocycle NOCACHE; Execution Result: The sequence has been created. Step 2: Delete the sequence: DROP SEQUENCE ABC; Execution Result: The s
Sequence meaningThe Oracle database provides a sequence object, provided by the system with its own growing serial number, usually used for the growth of the primary key or ordinal number of the database data records; Nanjing OCM Training Create a syntax format and descriptionCreate Sequencemysequenc--Custom sequence nameIncrement by 1--Set the step value, that i
(32 ));
Insert into test1values (myseq. nextval, 'abc ');
Insert into test1values (myseq. nextval, 'ddd );
Note: "myseq" indicates the sequence name; "nextval" indicates that the sequence value is added and the value is returned.
Currval returns the current value of the
,seq_autoid.nextval from table2 where condition
Of course, the above sentence is to insert data in bulk, you can also use values to insert. The point to note here is that the table1.f4 field needs to be a numeric type (number). In this way, the F4 field in your table1 is starting from 1, with a magnitude increment of the value, to achieve the automatic increase function. Of course the range can be defined by itself.
Another point is that the sequence
存中Third, how to use the sequenceAfter the sequence is created, you can use the nextval of the sequence to get the next value of the sequence, using Currval to view the current value. First use must use Nextval to produce a value before you can view it using Currval.//序列调用 产生
Tags: order oracle create modify ACL Replace. com Note NoCachesequence : Is an object provided by Oracle that produces a unique numeric value, primarily for use with a single primary key of a table. To Create a sequence : Create sequence seq_name//naming Start with 1//initial value Increment by 1//increment value MinValue 1//minimum value, default, system default MaxValue 999999999999999999//maximum value,
contains 30 pre-allocated serial numbers.
Code Demonstration: generate a serial number
SQL> CREATE SEQUENCE MYSEQMINVALUE 1Start with 1NOMAXVALUEIncrement by 1NOCYCLECACHE 30/
Sequence created
After creating a sequence, you can access the current value and the next value of the sequence through the two "pseudo columns
-- 1. Create a sequence create sequence seq_testincrement by 1 -- add a few start with 1 each time -- count nomaxvalue from 1 -- do not set the maximum value nocycle -- always accumulate, cache without loops 10 -- cache quantity -- 2. directly use the sequence insert into test values (seq_test.nextval, 'Liu bei ', 27); insert into test values (seq_test.nextval, '
,Released int not null,Primary key (id)); Create sequence MovieSeq; Create table Movie (Id int not null,Name VARCHAR2 (60) not null,Released int not null,Primary key (id)); Create sequence MovieSeq; Java code Insert into Movie (id, name, released) VALUES (MovieSeq. NEXTVAL, 'Gladiator', 2000 );Insert into Movie (id, name, released) VALUES (MovieSeq.
. However, sequences can be used anywhere, regardless of their names.
NEXTVAL and CURRVAL pseudo Columns
• NEXTVAL returns the next available Sequence Value. NEXTVAL returns a unique value each time it is referenced, even for different users. • CURRVAL obtains the current s
Resets the oracle sequence from a specified number.
Copy codeThe Code is as follows: declare
N number (10 );
V_startnum number (10): = 10000001; -- start from the number
V_step number (10): = 1; -- step
Tsql varchar2 (200 );
V_seqname varchar2 (200): = 'mip _ JF_SEQUENCE '; -- sequence name
Begin
Execute immediate 'select' | v_seqname | '. nextval from dual' into
Label:Oracle modified sequence (Sequence) Start Value method
The Oracle sequence (Sequence) is primarily used to generate serial numbers, which are often used in applications, especially as ID values, which are used to make table primary keys.
However, sometimes when you need to modify the
modifying a sequence is as follows:Creating and deleting sequencesExample 1: Creating a sequence:CREATE SEQUENCE ABC INCREMENT by 1 START with ten MAXVALUE 9999999 nocycle NOCACHE;Execution resultsThe sequence has been created.Step 2: Delete the sequence:DROP SEQUENCE ABC;Execution Result:The
1. What is a sequence diagram
is an interaction diagram that emphasizes the time order of messages. A sequence diagram describes the interaction between classes and classes in a class system, and it models these interactions as message exchanges. A sequence diagram is a model that describes how objects collaborate over time with certain behaviors. (emphasis is on
Problem model: It is known that a binary tree pre-sequence traversal sequence is 1,2,3,4,5,6, the middle sequence traversal is 3,2,4,1,6,5, and the design program calculates the order sequence.
In this case, you can create a tree through the pre-sequence traversal and the m
The first and middle traversal sequences of Binary Trees are known, and the latter are obtained.
First, recursively construct a binary tree and then recursively obtain the post-order sequence.
Ideas:
The first node of the first sequence is the root node of the binary tree to be constructed, and the root node of the binary tree is located in the middle sequence
sequence permission,
Create sequence emp_sequence increment by 1 -- add several
Start with 1 -- count from 1
NOMAXVALUE -- do not set the maximum value
NOCYCLE -- always accumulate without repeating
CACHE 10;
Once emp_sequence is defined, you can use CURRVAL, NEXTVAL
CURRVAL = returns the current sequence Value
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.