ORACLEPSU upgrade SummaryFirst, go to psu. first, let's take a look at readme.html. From this, we can know the detailed upgrade steps that have been rolled back. And avoids many pitfalls.Before executing the PSU, you must first confirm the version you are about to upgrade and the version of your own system database. Just like this time, we upgraded from 11.2.0.4.0 to 11.2.0.4.2, find the corresponding PATCH
If Oracle11gR2 adopts a single file system: Step: directly upgrade DBSOFT, data dictionary, install PSU, and install one-offpatch. If the single machine uses GRID + ASM:
If Oracle 11g R2 is a single-host file system: Step: directly upgrade db soft, data dictionary, install PSU, and install one-off patch. If the single machine uses GRID + ASM:
If Oracle 11g R2 is a single-host file system:Steps:Directly
In this document* ** Checked for relevance on 18-jul-2013 ***Information in this document applies to any platform. Oracle database-Enterprise Edition-version 10.2.0.5.0 to 10.2.0.5.0 [release 10.2] applies to: SymptomsHitting ORA-600 [kcblasm_1] In 10.2.0.5:In the alert:ORA-00600: Internal error code, arguments: [kcblasm_1], [103], [], [], [], [], [], [], []The call stack in the generated tracefiles looks similar:Kcblasm1 kcblasm kxhffndfreeslot kxhfnewbuffer qerhjgetnewbuffer ksxb1bqb kxhrpackC
The stream playback data source is from the isource interface object, which can be from the network, memory, or file. Streaming media has two types of content: one is a tabular media with the header, the starting position of the original data, such as A. Wav file, and the other is the original data. The encoding/decoding method is provided by the user separately. Streaming playback requires a specific implementation of isource. The application creates an isource interface, which remains valid th
"_external_scn_rejection_threshol D_hours "on some Oracle versions. The following text gives more information on setting this parameter:Set _external_scn_rejection_threshold_hours=24 after applyThe hidden parameter "_external_scn_rejection_threshold_hours" is introduced in January Critical Patch Update (CPU) A nd Patch Set Update (PSU) releases (and related bundles). Oracle recommends setting this parameter to the value of 10g and 11.1 releases-it do
OracleRAC automatically patches Opatchauto1 and installs the latest Optach patch 6880880: OPatchpatchofversion11.2.0.3.4forOracles
Oracle RAC automatically patches Opatch auto 1 and installs the latest Optach patch 6880880: OPatch patch of version 11.2.0.3.4 for Oracle s
Oracle RAC automatic patching Opatch auto
1. Install the latest Optach version.Patch 6880880: OPatch patch of version 11.2.0.3.4 for Oracle software releases 11.2.0.x (release L 2013)
2. Update the Opatch files of gird and
is JRE 1.8.0_65
PSU Release is JRE 1.8.0_66
Oracle recommends, Oracle E-business Suite customers use the CPU release (JRE 1.8.0_65) and only upgrade to the PSU re Lease (JRE 1.8.0_66) if they require a specific bug fix. For further information and bug fix details Seejava CPU and PSU releases explained.There currently no known issues in Oracle e-business
advise to set the hidden parameter "_ external_scn_rejection_threshold_hours" on some Oracle versions. The following text gives more information about setting this parameter:Set _ external_scn_rejection_threshold_hours = 24 after applyThe hidden parameter "_ external_scn_rejection_threshold_hours" is introduced in January 2012 Critical Patch Update (CPU) and Patch Set Update (PSU) releases (and related bundles ). oracle recommends setting this parame
Oracle RAC automatic patching Opatch auto
1. Install the latest Optach version.Patch 6880880: OPatch patch of version 11.2.0.3.4 for Oracle software releases 11.2.0.x (release L 2013)
2. Update the Opatch files of gird and oracle users.Unzip p6880880_112000_Linux-x86-64.zip-d/oracle/11.2.0/gridUnzip p6880880_112000_Linux-x86-64.zip-d/oracle/app/oracle/product/11.2.0/db_1
3. Generate a response FileCd/oracle/11.2.0/grid/OPatch/ocm/bin./Emocmrsp
4. download the latest
The latest PSU of Oracle is 11.2.0.3.6 on July 6, May 29, 2013. This upgrade is performed for RAC and DB respectively to prepare for the future RAC + DG Environment.System: linux 5.7 x86_64Database Version: 11.2.0.3.0Upgrade ORACLE from a single machineFirst, upgrade the standalone database to 11.2.0.3.6:Download the patch 11.2.0.3.6 with the patch number 16056266.1.1 check patch conflictsUse the oracle unzip patch package to go To the ORACLE_HOME dir
output) {String xmlStr = null; try {// used to generate an XML file // The Object implementing this interface contains the information required to build the conversion Result tree Result resultXml = new StreamResult (output ); // used to obtain the XML string format // A response stream, which can be used to collect the output in the string buffer to construct the string StringWriter writerStr = new StringWriter (); // Information required to build the conversion result tree. Result resultStr =
The clear all;%% DSB modulation% DSB (bilateral band) simply multiplies the modulated signal m (t) and the carrier signal cos (WT) to dt=1/800; T = $; The total time of the% sample. Spectral resolution (DF=1/T). t = 0:DT:T-DT;FM = 2; % modulated signal frequency, Unit KHZFC = 20; The frequency of the% carrier signal, Unit khzm = cos (2*pi*fm*t); % modulated signal s = m.*cos (2*pi*fc*t); %DSB modulated signal [F,SF] = T2F (t,s), figure (1) plot (t,s), Axis ([0,1,-1,1]), figure (2) plot (F,abs (
How do I enable the Dell Computer From PXE? ? Lander Zhang focuses on On-Demand IT infrastructure O M services for foreign companies, and IT helpdesk hands-on training practitionersHttp://blog.51cto.com/lander Problem description Recently, I am working on it standardization for more than 100 computers of a foreign company customer. The company has determined the model as Dell Elastic Compute service 7370.And the Dell poweredge 5050 SFF. The lapt
reaching olt varies, and the receiving part of the Olt is abrupt and high dynamic range.
e) Due to the ONU placed in the client, it requires ONU photoelectric integrated module high reliability, low power consumption, low cost.
3.ONU Optical Transceiver Integrated Module design
A) Structural design
To meet the above requirements, the structure of ONU Optical transceiver module adopts 2*6 pin with tail fiber SFF (Small Form Factor, small external
Label:Bug 9772171-database startup hangs on Windows if machine have more than cores [ID 9772171.8]This article has been explained: fix (fix) the bug in 11.2.0.2.And now the 11GR2 version number has been released 11.2.0.4. And 11.2.0.4 is finally the 11GR2 version number.So we recommend installing 11.2.0.4 plus the latest PSUThe latest PSU is able to query this article for the following: Oracle Database, Networking and Grid Agent patches for Microsoft
When there are more than 64 logical CPUs, the Windows Oracledb instance will be hang (suspended) when it starts (startup)Bug 9772171-Database startup hangs on Windows when machine has more than 64 cores [ID 9772171.8]This article has already stated that the bug has been fixed (fixed) in 11.2.0.2.Now 11gR2 has released 11.2.0.4, and 11.2.0.4 is the final 11gR2 version. Therefore, we recommend installing 11.2.0.4 and the latest psu.The latest psu can be
Upgrade versions of each JDK include odd and even versions, such as Java 8 update 8u73 and Java 8 update 8u74. Which version should I choose?Production environment Selection 8u73, test environment optional 8u74;Each release has a odd (CPU) and an even (PSU) number. So in this case, the CPU (critical fixes) and the (Critical plus non-critical fixes)General recommendation from Oracle in a production environment are to use the CPU releases and start test
service due to a network connectivity failure in the data center. If there is a better redundancy scheme, the impact of such an accident will be reduced, and will even dissolve into an imperceptible internal accident.
Most servers have two independent PSU, any PSU failure does not affect its normal service; In general, the server's two PSU will be connected to
Tags: CPU Oracle startup HangBug 9772171-database startup hangs on Windows if machine have more than cores [ID 9772171.8]This article has been explained: fix (fix) the bug in 11.2.0.2.The 11GR2 version is now available in 11.2.0.4, and 11.2.0.4 is the final 11GR2 version. So we recommend installing 11.2.0.4 plus the latest PSUThe latest PSU can be queried for this article: Oracle Database, Networking and Grid Agent patches for Microsoft platforms (Doc
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.