Organization-level project management and large-scale project management
Characteristics shared by projects within an organization
1. The ultimate goal of each goal is to support the realization of the company's established strategy for the enterprise to create profits
2, sharing the organization's resources, the al
process continues, as well as to identify and explain problems.10. What are the 3 types of outsourcing benefits when measuring outsourcing benefits?Answer: cost reduction, quality improvement, other benefits.11, an outsourced contract process, especially large-scale outsourcing, must go through which 2 stages? Understand the differences between the MOU and the contract and describe whether the MOU is legally binding?A: First understand the memorandum (MOU), then the overall contract.MoU is a sh
Reference Information System Project Manager tutorial (5-13 chapters) Comparative study
first, the overall management of the project1, the development of the Project Charter, 2, the formulation of the project Scope specification (Preliminary), 3, the development of Pro
1. version control technology and toolsVersion control is an essential tool for Program Development and Management. Especially in a collaborative team, appropriate version control tools can improve development efficiency and eliminate many problems caused by code versions. By using version control technology and tools, you can ensure that the same document involved by Different developers in software project
I. Definition of requirement Management
Requirement management is a systematic method for finding, recording, organizing, and tracking system demand changes.
Requirements can be defined as conditions or functions that must be met by the system.
Requirement management can be defined as: requirement management is a syste
Project Management Alliance
Free lecture on project set management standards and pgmp Certification
The American Project Management Association [PMI], a global project
of the configuration library
iii. Configuration Items
Configuration items are configuration-managed objects, which can be a module, a subsystem, or even an entire system. The granularity of each item's configuration item is different. The granularity of the configuration item is determined by the characteristics of the project, for example, in a large system, there are thousands of files composing the system, if the configuration
1. Code Warehouse Management: GitlabGitlab is an open source application developed using Ruby on Rails to implement a self-hosted Git project repository that can be accessed through a web interface for public or private projects.It features a similar feature to GitHub, with the ability to browse source code, manage defects, and annotate. You can manage the team's access to the warehouse, which makes it easy
Sixth Chapter Overall project ManagementThe process of overall project management includes the following:
Project start to develop preliminary project scope specification
Develop project
I. Main process of risk management
Risks in software projects refer to the damages or losses that may occur during software development and the software products themselves. The purpose of risk management is to identify potential problems before they arise, so that risk management activities can be planned and called as needed throughout the product or
1. What is configuration management?
Software Configuration Management is a technology that identifies, organizes, and controls software modifications. It is used to coordinate and control the entire process. It is a series of measures to control and standardize software products, their development processes and lifecycles through technical or administrative means.
The main goal of configuration
Project Procurement Management
Project Procurement management determines the mode of project management to some extent, it is the material base and main content of project execution, t
The cause of the incident was a bit accidental. When Addu talked to me about the system and said that our system is still ready for development, he wondered if there was a desktop document management system and asked why, the main reason is that many people do not manage their own hard disks or their own documents.
I felt excited when I heard it. But it is always too big, and the rules are too complicated. You cannot imagine any rules.
As a result
Project set Management Research Center expert translation and review project set management standards
(Beijing, July 4, 2014) Program Management Research Center under the International Project
General Manager of Xuan Xiaofeng Project Management Alliance, PMP
Project management refers to centralized management and coordination of multiple associated projects. Compared to implementing separate management for multiple pr
This article is combined with the "Software project Management" Curriculum knowledge of the summary, I do not know why I want to sum up this article, a lot of things do not have a reason to do, I hope to help you, especially in this class students! Sometimes also want to write this article in the end there is no use, it is not useful, But there's no way to be interested.--I have no his, idealism to you(By:e
The entire project management knowledge area includes various processes and activities required for identifying, determining, integrating, unifying, and coordinating different processes and project management activities in each project m
12.1 Planning Procurement management
Planning procurement Management is the process of recording project procurement decisions, clarifying procurement methods and identifying potential sellers.
The main role of this process is to determine whether external support is required and, if necessary, to decide what to purchase, how to purchase, how much to purchase,
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.