After the House is down, record the whole decoration process for future reference.
Last Saturday, the main job was to perform room inspection. Before the house inspection, I chatted with you in the owner Group of the residential area. We gave a lot of suggestions and finally decided whether to find a supervision company to help check the house, finally, I decided to look for "baijia Security Supervision.
The supervisor registers in advance and confirms the line before leaving work on Friday. There is a small twist in the middle, that is, the phone number of LP is out of power, causing no contact from the other party, fortunately, I made a phone call and confirmed it. Now I am waiting for the room inspection.
In the morning, I arrived at the property company according to the agreed time. The other party seems to be not well prepared, and some paid personnel have not yet arrived. After a while, I began to pay the fee according to the process. The process is as follows:
1. Acceptance contract, check-in notice, etc.
2. I have received the "residential quality assurance Certificate" and "residential user manual". The legendary "completion acceptance Filing Form" is not displayed.
3. I signed a bunch of owner manuals and did not read them carefully.
4. Pay the license fee and garbage collection fee.
5. Pay the heating fee. Because you do not plan to stay in the room, you have paid 20% yuan. If you pay the full amount, you will enjoy a discount on heating.
6. Pay the cable TV fee, more than 250 yuan, not the current price of more than 220 yuan.
7. Get the key and start the room test. The key is set to 1a6b.
8. The property provides a small electric kettle.
These things will soon be processed. The property has arranged for a person to take us to the room for inspection. The other party claims to be a room Examiner, but after learning that the other party is just a plumbing worker, I just want to open the door.
With the assistance of the professional room Examiner of baijia security, the main problems found are as follows:
1. The biggest problem with Windows is that the windows are broken, the windows are scratched, pulled, and sealed. There are also a lot of problems, and there are also some lax closures.
2. The second is the door, which mainly involves small locks, sealing strips, and loose sealing.
3. There are two blank walls, but nothing else can be seen.
Well, why are we only able to find these problems because of the lack of water, electricity, and plumbing? Other projects cannot be accepted.
To sum up, the acceptance process is actually very simple, but it is still necessary to have a professional room examiner. Otherwise, I will just look at it myself, but do not trust the room examiner provided by the property, the attitude of these housing auditors is average, and they always urge you to read it quickly.