1: When you pass the solution, you must go through every point. Every point must know how data is obtained. Otherwise, a major problem will occur in the future development process. 2: when developing a development plan, you must predict it based on the characteristics of the developers. For example, Sun XX does not know Java, but the estimated time is very short. As a result, development is very passive. 3: when discussing with the business department, you must record the ideas at that time in detail. Otherwise, you will not remember what you said later. 4: when development lags behind, you can write business logic first. And ask the business department to confirm the business logic. In this way, development and testing are basically parallel. You can verify the logic accuracy first. This can be done in the future to speed up the progress. 5: The testing department must be involved throughout the process and check each module. Strong requirement for test intervention. 6: Make sure the prototype is correct. Be sure to complete. 7: If you have asked for leave, you must notify me three days in advance. 8: the project manager is too deeply engaged in development. Cause ProgramHighly dependent members. Insufficient manpower is a contradiction. 9. Fully respect the opinions of all Parties (including correct and incorrect ones) and absorb the opinions. Be impatient. 10: In the development window, only one business type is selected based on the tree structure, and then one type name is input. It takes six hours to save the function (the type name cannot be repeated. 11: Evaluate the programmer's development efficiency correctly Before estimating the workload. At what level can developers evaluate their development efficiency? 12: the development time for new local business monitoring accounts for about 60% of the development time. This was estimated to be insufficient at the beginning. The new local business is complicated, resulting in a large amount of development time. 13: The quality monitoring system mainly depends on the data center. The accuracy of the data affects the system's launch. The responsibility should be clearly stated. A clear resolution time should be provided to the data center. If the resolution still fails within the specified time, it should be submitted to a higher department. 14. Note the preparation of the training notification during training. This training notice is ambiguous, resulting in Baoan, Longgang's branch office and delivery of only one person.